Quick answers
What is this project?
Expansion in Production capacity in Quartz Feldspar (Minor Mineral) Mining Project is a proposed mining project in Kabara, Tonk, Rajasthan. The site covers 61.5 acres.
Who is building it?
The applicant is Bijender Goyal.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Jan 2024), as of 27 Nov 2026.
Where is it?
In Kabara, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 61.5 acres.
When was it filed?
The application was filed on 11 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in Production capacity in Quartz Feldspar (Minor Mineral) Mining Project
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Jan 2024 |
| Application filed | 11 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bijender Goyal |
| Land area | 61.5 acres (24.9 ha) |
| Project cost | ₹2 crore |
| Village / locality | Kabara |
| Taluk / tehsil | Tonk |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00045 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Feb 2025 | Environmental approval granted | 61.5 acres | ₹2 crore |
| Early planning filed 11 Jan 2024 (this page) | Cleared for impact study | 61.5 acres | ₹2 crore |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 61.5 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kabara, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Production capacity in Quartz Feldspar (Minor Mineral) Mining… — environmental approval granted, 0 m away
- Proposed Quartz & Feldspar Mining Project, Ref. No.- 20221000062785 — environmental approval granted, 2.2 km away
- M/s Shree Dev Stones, M.L No. 74/2002, Near Village - Jhalara, Tehsil - Tonk,… — environmental approval granted, 5 km away
- M/s Shree Dev Stones, M.L No. 75/2002, Near Village - Jhalra, Tehsil - Tonk,… — environmental approval granted, 5.1 km away
- M/s Shree Dev Stones, M.L No. 59/2003, Near Village - Jhalara, Tehsil - Tonk,… — environmental approval granted, 5.4 km away
- M/s Shree Dev Stones, M.L No. 35/1992, Near Village - Hansolai, Tehsil -… — environmental approval granted, 5.4 km away
- M/s Shree Dev Stones, M.L No. 45/2001, Near Village - Hansolai, Tehsil -… — environmental approval granted, 5.5 km away
- M/s Shree Dev Stones, M.L No. 63/1993, Area 1.00 Hect., Near Village -… — environmental approval granted, 5.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.