What is Developing? Open the mapMap

Cleared for impact studyIndustry · Alwar, Rajasthan

Greenfield Project for Installation of Steel Plant Having Production Capacity of M.S Billets of 3,56,400 Tpa With Facility of Two Induction Furnace of 30 Ton Each, Rolling Mill of 3,37,000 Tpa for Manufacturing of Tmt Bar/Rolled Project/Structural Steel and Zinc Recovery Plant of Capacity 6 Tpd

Greenfield Project for Installation of Steel Plant Having Production Capacity of M.S Billets of 3,56,400 Tpa With Facility of Two Induction Furnace of 30 Ton Each, Rolling Mill of 3,37,000 Tpa for Manufacturing of Tmt Bar/Rolled Project/Structural Steel and Zinc Recovery Plant of Capacity 6 Tpd is a proposed industrial project in Karoli, Tijara, Alwar, Rajasthan. The site covers 15.4 acres. Its stated project cost is ₹150 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Nov 2022).

See it on the live map All projects in Alwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project for Installation of Steel Plant Having Production Capacity of M.S…

Project details

StatusCleared for impact study
Status since28 Nov 2022
Application filed28 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSbf Rapid Industries Private Limited
Land area15.4 acres (6.2 ha)
Project cost₹150 crore
Village / localityKaroli
Taluk / tehsilTijara
DistrictAlwar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-00089

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 22 Jun 2023Environmental approval granted15.4 acres₹150 crore
Early planning filed 28 Nov 2022 (this page)Cleared for impact study15.4 acres₹150 crore

In context

127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15.4 acres, this one is larger than 85% of them.

29 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Karoli, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.