Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Nov 2022 |
| Application filed | 17 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sampat Singh |
| Land area | 5 acres (2 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Mathasula |
| Taluk / tehsil | 0 |
| District | Jaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00099 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Sept 2025 | Lapsed | 5 acres | ₹90 lakh |
| Early planning filed 17 Nov 2022 (this page) | Cleared for impact study | 5 acres | ₹90 lakh |
In context
1,151 applications in Jaipur since January 2022 are in the same category (Mining): 726 approved, 60 filed or under review, and 365 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5 acres, this one is larger than 85% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mathasula, 0, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s S.S. Stone Corporation "Masonry Stone (Minor Mineral) mining project"… — lapsed, 0 m away
- Proposed Industrial Area Development (Mathasula Phase-II) Area – 25.244 Ha.… — returned to applicant, 2.3 km away
- Construction of Passenger Ropeway at Banki Mata Temple, Raisar Jaipur — more information requested, 2.4 km away
- Proposed Industrial Area Development (Mathasula Phase-I & Phase II) Total… — lapsed, 2.4 km away
- Laying Underground Ofc in Row of Existing Road From Chandwaji to Lunetha From… — more information requested, 3.3 km away
- Widening and Strengthening of Road from SH-55 to Raipur - Mehghor - Chainpura… — more information requested, 3.4 km away
- Widening and Strengthening of Road from SH-55 to Raipur - Mehghor - Chainpura… — lapsed, 3.8 km away
- Upgradation of existing Two-lane Paved Shoulders of Manoharpur to Dausa… — under wildlife review, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.