Quick answers
What is this project?
Proposed Granite Mining Project, Ref No.-20221000061316, ML NO.-56/2022 is a proposed mining project in Ekalseenga, Kekri, Ajmer, Rajasthan. The site covers 5.7 acres.
Who is building it?
The applicant is Narendra Bhakar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Nov 2022), as of 27 Nov 2026.
Where is it?
In Ekalseenga, Kekri, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹3.3 crore and a site of 5.7 acres.
When was it filed?
The application was filed on 28 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Granite Mining Project, Ref No.-20221000061316, ML NO.-56/2022
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Nov 2022 |
| Application filed | 28 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Narendra Bhakar |
| Land area | 5.7 acres (2.3 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Ekalseenga |
| Taluk / tehsil | Kekri |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00174 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Aug 2023 | Environmental approval granted | 5.7 acres | ₹3.3 crore |
| Early planning filed 28 Nov 2022 (this page) | Cleared for impact study | 5.7 acres | ₹3.3 crore |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.7 acres, this one is larger than 55% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 28.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 55 mining leases have applied within 5 km.
Where it is
Ekalseenga, Kekri, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Granite Mining Project, Ref No.-20221000061316, ML NO.-56/2022 — environmental approval granted, 0 m away
- EC Transfer of Existing Granite and Masonry Stone Mining Project {M.L. No.-… — lapsed, 300 m away
- Re-appraisal of EC issued by DEIAA for Ekalsingha Granite Mine (M.L. NO.:… — lapsed, 350 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer [Rajasthan] of… — environmental approval granted, 400 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer [Rajasthan] of… — environmental approval granted, 400 m away
- Ekalsinga Granite Mine, M.L. No. 13/2020", Khasra No.: 418, 419, 421, 510, 511 — environmental approval granted, 400 m away
- Shri Sanjay Bhardwaj, Granite Mining Project M.L. No. 109/2018 — under environmental review, 450 m away
- Shri Sanjay Bhardwaj, Granite Mining Project M.L. No. 109/2018 — cleared for impact study, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.