One of 2 filings for this project. The project's main page, with every filing and where each stands: "Quartz, Feldspar and Masonry Stone Mining Project, ML No. 19/2022"
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bhagwati Gameti |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Bhansol |
| Taluk / tehsil | Mavli |
| District | Udaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00254 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Aug 2024 | Environmental approval granted | 4.8 acres | ₹1.6 crore |
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 4.8 acres | ₹1.6 crore |
In context
887 applications in Udaipur since January 2022 are in the same category (Mining): 493 approved, 45 filed or under review, and 349 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.8 acres, this one is larger than 53% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Bhansol, Mavli, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Quartz, Feldspar and Masonry Stone Mining Project, ML No. 19/2022" — environmental approval granted, 0 m away
- Quartz, Feldspar and Masonry Stone Mining Project, ML No. 20/2022" Reference… — environmental approval granted, 100 m away
- Quartz, Feldspar and Masonry Stone Mining Project, ML No. 20/2022" Reference… — cleared for impact study, 100 m away
- Proposed Quartz & Feldspar Mining Project, M.L.No. 12/2023 Reference No.… — environmental approval granted, 1.5 km away
- Re-Appraisal of EC Granted from DEIAA, Udaipur To SEIAA", for Existing "Quartz… — environmental approval granted, 2.1 km away
- Shri Amit Sanadhya, Plot No. -22, Quartz & Feldspar mining Project — cleared for impact study, 3 km away
- Re-appraisal of EC issued by DEIAA for Kheda Bhansol Gadwada Quartz & Feldspar… — environmental approval granted, 3 km away
- Re-appraisal of EC issued by DEIAA for Bhansol Quartz & Feldspar Mine (M.L.… — lapsed, 3 km away
More from Bhagwati Gameti in Udaipur
- Quartz, Feldspar and Masonry Stone Mining Project, ML No. 20/2022" Reference… — environmental approval granted
- Quartz, Feldspar and Masonry Stone Mining Project, ML No. 20/2022" Reference… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.