What is this project?
Expansion in Production capacity of Granite & Masonry Stone Mining Project is a proposed mining project in Baghera, Kekri, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Lokender Rathore.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Nov 2022), as of 27 Nov 2026.
Where is it?
In Baghera, Kekri, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 30 Nov 2022.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Nov 2022 |
| Application filed | 30 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Lokender Rathore |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Baghera |
| Taluk / tehsil | Kekri |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00332 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 14.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 65 mining leases have applied within 5 km.
Where it is
Baghera, Kekri, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re Appraisal of EC granted from DEIAA, Ajmer of Proposed Granite & Masonry… — environmental approval granted, 0 m away
- Terms of Reference (TOR) for "Granite Mining Project, Ref No.-20221000050521,… — under environmental review, 200 m away
- Terms of Reference (TOR) for "Granite Mining Project, Ref No.-20221000050521,… — cleared for impact study, 200 m away
- Cluster No-87 " Nayagaon" Granite & Masonry Stone Mine — environmental approval granted, 300 m away
- "Granite Mining Project, M.L. No. 11/2022" — environmental approval granted, 450 m away
- Proposed Project of Granite Mining Project (M.L. Area 1.04 ha. Govt. land) and… — environmental approval granted, 550 m away
- Proposed Project of Granite Mining Project (M.L. Area 1.04 ha. Govt. land) and… — cleared for impact study, 550 m away
- Cluster "Nayagaon" Granite Mining Project, ML. No. 18/2022 Proposed Production… — environmental approval granted, 600 m away
More from Lokender Rathore in Ajmer
- Re Appraisal of EC granted from DEIAA, Ajmer of Proposed Granite & Masonry… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.