What is Developing? Open the mapMap

Cleared for impact studyIndustry · Alwar, Rajasthan

Expansion in existing Rolling Mill from 79,800 TPA to 2,00,000 TPA, PNG based Reheating Furnace from 15 tonne to 25 tonne with additional facility of Two Induction Furnace (20 IF + 15 IF) with 2 strands of 4/7m radius CCM and 25 tonne LRF for production of 1,73,250 TPA M.S Billets/ingots and Slag Crushing Unit of 60 TPD Located at RIICO Industrial Area, Phase III, Bhiwadi near Village-Harchandpur, Tehsil-Tijara, District-Alwar, Rajasthan by M/s Petropol India Limited.

Expansion in existing Rolling Mill from 79,800 TPA to 2,00,000 TPA, PNG based Reheating Furnace from 15 tonne to 25 tonne with additional facility of Two Induction Furnace (20 IF + 15 IF) with 2 strands of 4/7m radius CCM and 25 tonne LRF for production of 1,73,250 TPA M.S Billets/ingots and Slag Crushing Unit of 60 TPD Located at RIICO Industrial Area, Phase III, Bhiwadi near Village-Harchandpur, Tehsil-Tijara, District-Alwar, Rajasthan by M/s Petropol India Limited is a proposed industrial project in Harchandpur, Tijara, Alwar, Rajasthan. The site covers 7.2 acres. Its stated project cost is ₹120 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Jan 2024).

See it on the live map All projects in Alwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in existing Rolling Mill from 79,800 TPA to 2,00,000 TPA, PNG based Reheating…

Project details

StatusCleared for impact study
Status since31 Jan 2024
Application filed13 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPetropol India Limited
Land area7.2 acres (2.9 ha)
Project cost₹120 crore
Village / localityHarchandpur
Taluk / tehsilTijara
DistrictAlwar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-00535

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 23 Oct 2024Environmental approval granted7.2 acres₹120 crore
Early planning filed 13 Dec 2023 (this page)Cleared for impact study7.2 acres₹120 crore

In context

127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.2 acres, this one is larger than 71% of them.

45 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Harchandpur, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Petropol India Limited in Alwar

All 3 Petropol India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.