One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in existing Rolling Mill from 79,800 TPA to 2,00,000 TPA, PNG based Reheating…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 31 Jan 2024 |
| Application filed | 13 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Petropol India Limited |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹120 crore |
| Village / locality | Harchandpur |
| Taluk / tehsil | Tijara |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00535 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 23 Oct 2024 | Environmental approval granted | 7.2 acres | ₹120 crore |
| Early planning filed 13 Dec 2023 (this page) | Cleared for impact study | 7.2 acres | ₹120 crore |
In context
127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.2 acres, this one is larger than 71% of them.
45 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harchandpur, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in existing Rolling Mill from 79,800 TPA to 2,00,000 TPA, PNG based… — environmental approval granted, 0 m away
- Petropol India Limited-"Regularization of the existing project of Rolling Mill… — environmental approval granted, 0 m away
- Ashiana Ispat Limited- "Regularization of the existing Rolling Mill having… — environmental approval granted, 500 m away
- Ashiana Ispat Limited- "Regularization of the existing Rolling Mill having… — lapsed, 500 m away
- Expansion in Production Capacity of Existing Melamine Powder & Crockery Powder… — cleared for impact study, 600 m away
- Elegance TMT Pvt. Ltd.-"Regularization of the existing Rolling Mill having… — environmental approval granted, 600 m away
- Regularization of the existing project of Rolling Mill having capacity of MS… — lapsed, 650 m away
- Regularization of the existing project of Rolling Mill having capacity of MS… — cleared for impact study, 650 m away
More from Petropol India Limited in Alwar
- Petropol India Limited-"Regularization of the existing project of Rolling Mill… — environmental approval granted
All 3 Petropol India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.