Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Jul 2023 |
| Application filed | 21 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Pharvinex Chempharm Private Limited |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹6 crore |
| Village / locality | Kota Municipal Area |
| Taluk / tehsil | Ladpura |
| District | Kota |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-00877 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Jul 2023 (this page) | Environmental approval granted | 2 acres | ₹6 crore |
| Early planning filed 1 Mar 2023 | Cleared for impact study | 2 acres | ₹6 crore |
In context
21 applications in Kota since January 2022 are in the same category (Industry): 13 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2 acres, this one is smaller than 95% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kota Municipal Area, Ladpura, Kota, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Pharvinex Chempharm Pvt. Ltd. — cleared for impact study, 0 m away
- Industrial project by Lokhith Healthcare Private Limited — environmental approval granted, 300 m away
- Industrial project by Lokhith Healthcare Private Limited — cleared for impact study, 300 m away
- Diversion of 11.2081 Hector Forest Land for Construction of Development… — lapsed, 4.7 km away
- M/s Prem Jain Ispat Udyog Limited for the manufacturing of MS ingots and TMT… — environmental approval granted, 5.2 km away
- M/s Prem Jain Ispat Udyog Limited for the manufacturing of MS ingots and TMT… — cleared for impact study, 5.2 km away
- Permission for Running of Existing Gaushala , Lakhawa Distt. Kota (Rajasthan) — under forest review, 5.3 km away
- Geotechnical Investigation for the Construction of 3rd and 4th Railway Lines… — more information requested, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.