Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jun 2023 |
| Application filed | 8 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | National Lime Stone Company Private Limited |
| Land area | 85.1 acres (34.4 ha) |
| Project cost | ₹15 crore |
| Village / locality | Kujota |
| Taluk / tehsil | Kotputli |
| District | Jaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-01210 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jun 2023 (this page) | Environmental approval granted | 85.1 acres | ₹15 crore |
| Early planning filed 10 Nov 2022 | Cleared for impact study | 85.1 acres | ₹15 crore |
In context
1,151 applications in Jaipur since January 2022 are in the same category (Mining): 726 approved, 60 filed or under review, and 365 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 85.1 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 20 have applied within 5 km.
Where it is
Kujota, Kotputli, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of "LIMESTONE, MARBLE, DOLOMITE and MASONRY STONE (Minor Mineral)"… — cleared for impact study, 0 m away
- Limestone Mining Project (ML Area 318.78 ha) with Limestone Production… — environmental approval granted, 1.1 km away
- Shri Brij Mohan Modi (Dolomite With Inclusion Of Masonry Stone And Addition Of… — environmental approval granted, 1.3 km away
- Mining project by M/s Dev Stone Minerals — environmental approval granted, 1.6 km away
- Proposed Masonry Stone Mining Project, ML.No.- 4/2024 (Ref No.-… — under environmental review, 1.9 km away
- Amendment in existing Environmental Clearance letter No… — under environmental review, 2 km away
- "Expansion in Production Capacity of Earlier Granted EC from 80,000 TPA (ROM)… — lapsed, 2.3 km away
- "Expansion in Production Capacity of Earlier Granted EC from 80,000 TPA (ROM)… — withdrawn, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.