Quick answers
What is this project?
"Existing Wallastonite (Major Mineral)& Calcite(Minor Mineral) mining project" [M.L.No- 20/1998&Khasra no-1241,1309,1324&1325] over an Area of 4.0Hectares, located Near Village–Ana, Tehsil-Desuri, District- Pali(Rajasthan) with Proposed Production Capacity–28840 TPA (ROM) {Saleable Mineral–25956 TPA and Waste– 2884 TPA} by M/s Ambuja Rasayan Prop-Shri Surendra Singh Rajpurohit is a proposed mining project in Ana, Desuri, Pali, Rajasthan. The site covers 9.9 acres.
Who is building it?
The applicant is Surendra Purohit.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Nov 2023), as of 27 Nov 2026.
Where is it?
In Ana, Desuri, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹3 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 20 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Existing Wallastonite (Major Mineral)& Calcite(Minor Mineral) mining project" [M.L.No-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Nov 2023 |
| Application filed | 20 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Surendra Purohit |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹3 crore |
| Village / locality | Ana |
| Taluk / tehsil | Desuri |
| District | Pali |
| State | Rajasthan |
| Location from | Site area on record |
| Our reference | WID-RJ-01296 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Aug 2024 | Environmental approval granted | 9.9 acres | ₹3 crore |
| Early planning filed 20 Nov 2023 (this page) | Cleared for impact study | 9.9 acres | ₹3 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 73% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 16.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Ana, Desuri, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Ministry of Road Transport Plans ₹700-Crore Elevated Road on NH-162E in Pali, Rajasthan (13.6 km away).
Other projects nearby
- "Existing Wallastonite (Major Mineral)& Calcite(Minor Mineral) mining project"… — environmental approval granted, 0 m away
- Existing Lime Stone Mining Project ML No. 79/1997 Khasra No 1325, Area 2.62… — lapsed, 350 m away
- Re-appraisal Earlier EC Granted By DIEAA Pali M/s Amritam Enterprises , ML No-… — lapsed, 1.1 km away
- Proposed Granite Mining Project, M.L. no.-58/2019 (Ref. No. 20191000010415),… — lapsed, 5.6 km away
- Shree Karni Mata Mines, Minerals-Masonry stone, ML No.-287/1996 — lapsed, 5.9 km away
- Shree Karni Mata Mines, Minerals-Masonry stone, ML No.-287/1996 — environmental approval granted, 5.9 km away
- Sindarli Granite Applied ML Area (Ref. No. 202410000124855, Khasra No.: 501,… — under environmental review, 6.5 km away
- Proposed Granite Mining Project, Area- 1.2104 ha.(Pvt. Land), Reference No.… — under environmental review, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.