What is Developing? Open the mapMap

Cleared for impact studyIndustry · Alwar, Rajasthan

Expansion in Bulk Drug manufacturing capacity (API) from 142 TPA to 350 TPA with existing Steroid (8 TPA) at Plot No. C-23, 23A, 24 & 25, RIICO Industrial Area, Village: Sotanala, Tehsil: Behror, District: Alwar (Rajasthan) by Shree Jee Laboratory Pvt. Ltd.

Expansion in Bulk Drug manufacturing capacity (API) from 142 TPA to 350 TPA with existing Steroid (8 TPA) at Plot No. C-23, 23A, 24 & 25, RIICO Industrial Area, Village: Sotanala, Tehsil: Behror, District: Alwar (Rajasthan) by Shree Jee Laboratory Pvt. Ltd is a proposed industrial project in Jainpurbas, Behror, Alwar, Rajasthan. The site covers 6.9 acres. Its stated project cost is ₹213 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Apr 2023).

See it on the live map All projects in Alwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in Bulk Drug manufacturing capacity (API) from 142 TPA to 350 TPA with…

Project details

StatusCleared for impact study
Status since13 Apr 2023
Application filed21 Mar 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShree Jee Laboratory PVT. LTD.
Land area6.9 acres (2.8 ha)
Project cost₹213 crore
Village / localityJainpurbas
Taluk / tehsilBehror
DistrictAlwar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-01546

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 26 Oct 2023Environmental approval granted6.9 acres₹213 crore
Early planning filed 21 Mar 2023 (this page)Cleared for impact study6.9 acres₹213 crore

In context

127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.9 acres, this one is larger than 69% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jainpurbas, Behror, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Shree Jee Laboratory projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.