Quick answers
What is this project?
Proposed Granite Mining Project ; Ref No:-20221000067066, Khasra No.-48/09 & 49/03, Area:2.3843 Hect.(Pvt. Land);, Near Village:- Bachera Tehsil:- Malpura, District:- Tonk (Raj.) In Favor Of M/S Shree Balaji Granites is a proposed mining project in Bachhera, Malpura, Tonk, Rajasthan. The site covers 5.9 acres.
Who is building it?
The applicant is Shree Balaji Granites.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Aug 2023), as of 27 Nov 2026.
Where is it?
In Bachhera, Malpura, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 5.9 acres.
When was it filed?
The application was filed on 11 Aug 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Aug 2023 |
| Application filed | 11 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shree Balaji Granites |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Bachhera |
| Taluk / tehsil | Malpura |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-01641 |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.9 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Bachhera, Malpura, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Granite Mining Project; (Ref.No -20221000067066), Area: 2.3843 Hect.,… — under environmental review, 0 m away
- Proposed Granite Mining Project ; Ref no.-20221000052007, , Khasra… — environmental approval granted, 850 m away
- Proposed Granite Mining Project ; R.F No. 20221000052261 , Area: 1.1746… — cleared for impact study, 900 m away
- Transfer Ec From Shri Radheyshyam Sharma to Smt. Prem Devi, M.L No.-11/2006,… — lapsed, 950 m away
- Smt. Prem Devi W/o Late Shri Radheyshyam Sharma, M.L No.- 11/2006, Area 1.00… — lapsed, 950 m away
- Granite Mining Project, Ref No.-20221000053533 — environmental approval granted, 2.6 km away
- "Granite Mining Project, (Ref. No.-20211000037150)", Area-2.8758 Hectare,… — cleared for impact study, 3.4 km away
- Granite Mining Project (Ref No. 20211000041266 Area 1.9506 Ha.) (Cluster Area… — environmental approval granted, 4.2 km away
More from Shree Balaji Granites in Tonk
- Proposed Granite Mining Project; (Ref.No -20221000067066), Area: 2.3843 Hect.,… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.