Quick answers
What is this project?
Proposed Masonry Stone Mining Project; Ref No.- 20221000062037, Area: 1.4423 Hect.(Pvt. Land);, Near Village-Lamba Harisingh, Tehsil-Malpura, District- Tonk (Raj.) in favor of Smt. Badam Devi W/o Shri Sharwan is a lapsed mining project in Adusiya, Malpura, Tonk, Rajasthan. The site covers 3.6 acres.
Who is building it?
The applicant is Badam Devi.
Has it been approved?
No. The application was lapsed on 13 Jul 2026, so it is no longer under consideration.
Where is it?
In Adusiya, Malpura, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 3.6 acres.
When was it filed?
The application was filed on 11 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Jul 2026 |
| Application filed | 11 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Badam Devi |
| Land area | 3.6 acres (1.4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Adusiya |
| Taluk / tehsil | Malpura |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-01668 |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.6 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Adusiya, Malpura, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Masonry Stone Mining Project, Reference No.20221000062037, Area… — under environmental review, 0 m away
- "Granite" (Minor Mineral) Mining Project, Ref. No.- 20221000050552, with… — environmental approval granted, 2.5 km away
- Granite" (Minor Mineral) Mining Project, Ref. No.- 20221000050550, with… — environmental approval granted, 2.5 km away
- Existing Quartz & Feldspar Mining Project [Non -Operational M.L.. No. 1/2008… — more information requested, 2.9 km away
- EC Transfer From Shri Jorawar Singh To M/s Shree Ganpati Mines M.L. No.… — lapsed, 3.2 km away
- M/s Shree Ganpati Mines (Old Name- Shri Jorawar Singh S/o Shri Indra Singh),… — environmental approval granted, 3.2 km away
- Proposed Quartz, Feldspar& Mica Mining Project; Ref. No:- 20231000089388… — environmental approval granted, 3.3 km away
- M/s Matheshwari Mines & Minerals, M.L. No. 09/1996, Re-appraisal of… — environmental approval granted, 4.3 km away
More from Badam Devi in Tonk
- Proposed Masonry Stone Mining Project, Reference No.20221000062037, Area… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.