Project details
| Official title | Approval of Final EIA/EMP report for "Granite Cluster Mining Project", Ref No. 20201000029481, ML No.-23/2020, having ML Area- 1.00355 ha, falling in Cluster No.-24, Cluster Area: - 5.22935 hectare; with proposed annual Production Capacity 96,650 TPA (ROM), Carrying Capacity of Cluster- 5,90,633 TPA (ROM) located at Near Village: Alniyawas, Tehsil: Riyanbadi, District: Nagaur(Raj.) in favour of M/s Rudra Mines & Minerals. |
|---|---|
| Status | Environmental approval granted |
| Status since | 10 Aug 2023 |
| Application filed | 10 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rudra Mines & Minerals |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Alniyavas |
| Taluk / tehsil | Riyan Badi |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-02023 |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 13.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 38 mining leases have applied within 5 km.
Where it is
Alniyavas, Riyan Badi, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Durga Mines & Minerals Term Of Reference Environment Clearance Granite… — cleared for impact study, 450 m away
- Proposed Granite Mining Project; ML No. – 11/2023 (Ref. No- 20231000089126),… — cleared for impact study, 450 m away
- M/s Durga Mines & Minerals Term Of Reference Environment Clearance Granite… — lapsed, 450 m away
- E.C For Proposed Granite Cluster Mining Project M.L.No.2/2022 ,Area 1.26056 ha… — environmental approval granted, 550 m away
- Proposed Granite Mining Project M.L.No.-02/2022 Area-1.26056 Ha, Khasra… — cleared for impact study, 550 m away
- Proposed Granite Mining Project; Ref No.- 202410000104606, Area: 1.9513 Hect.… — cleared for impact study, 700 m away
- E.C for Proposed Granite Mining Project M.L.No 23/2021,Area 1.00085 Near… — environmental approval granted, 1.2 km away
- Proposed Granite Mining Project M.L.No.-23/2022 Area-1.00085 Ha, Khasra… — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.