Cleared for impact studyMining · Barmer, Rajasthan

Gudli Quartz & Feldspar Mining Project ML No 41/2023, Proposed Production – 2,22,222 TPA (ROM) of Mineral Quartz & Feldspar Applied Area- 3.1297 HECT. Cluster area 33.9364 Hect. N/v - Gudli, Tehsil- Girwa (Kurawad), Dist-Udaipur (Raj) Favor of Miss Jaslin Kour D/o Kulvendra Singh

Gudli Quartz & Feldspar Mining Project ML No 41/2023, Proposed Production – 2,22,222 TPA (ROM) of Mineral Quartz & Feldspar Applied Area- 3.1297 HECT. Cluster area 33.9364 Hect. N/v - Gudli, Tehsil- Girwa (Kurawad), Dist-Udaipur (Raj) Favor of Miss Jaslin Kour D/o Kulvendra Singh is a proposed mining project in Darura, Barmer, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Aug 2024).

See it on the live map All projects in Barmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Gudli Quartz & Feldspar Mining Project ML No 41/2023, Proposed Production – 2,22,222 TPA (ROM) of Mineral Quartz & Feldspar Applied Area- 3.1297 HECT. Cluster area 33.9364 Hect. N/v - Gudli, Tehsil- Girwa (Kurawad), Dist-Udaipur (Raj) Favor of Miss Jaslin Kour D/o Kulvendra Singh is a proposed mining project in Darura, Barmer, Rajasthan. The site covers 2.5 acres.

Who is building it?

The applicant is Jasleen Kaur.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Aug 2024), as of 27 Nov 2026.

Where is it?

In Darura, Barmer, Rajasthan.

How big is it?

It has a stated cost of ₹3 crore and a site of 2.5 acres.

When was it filed?

The application was filed on 4 May 2024.

Project details

StatusCleared for impact study
Status since6 Aug 2024
Application filed4 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJasleen Kaur
Land area2.5 acres (1 ha)
Project cost₹3 crore
Village / localityDarura
Taluk / tehsilBarmer
DistrictBarmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-02145

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Apr 2026Lapsed2.5 acres₹3 crore
Early planning filed 4 May 2024 (this page)Cleared for impact study2.5 acres₹3 crore

In context

878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 51% of them.

13 other mining leases have applied within 500 m of this site; together with this one they cover 40.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 46 mining leases have applied within 5 km.

Where it is

Darura, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.