One of 2 filings for this project. The project's main page, with every filing and where each stands: "Expansion of Fertilizer Manufacturing Plant" at Plot No. G1-29 to G-39 & H1-85, RIICO…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Jan 2024 |
| Application filed | 17 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Blue Phosphate Limited |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹31.7 crore |
| Village / locality | Sanwara |
| Taluk / tehsil | Mavli |
| District | Udaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-02154 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 19 May 2025 | Environmental approval granted | 3.2 acres | ₹31.7 crore |
| Early planning filed 17 Jan 2024 (this page) | Cleared for impact study | 3.2 acres | ₹31.7 crore |
In context
38 applications in Udaipur since January 2022 are in the same category (Industry): 27 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.2 acres, this one is larger than 53% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanwara, Mavli, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Expansion of Fertilizer Manufacturing Plant" at Plot No. G1-29 to G-39 &… — environmental approval granted, 0 m away
- Proposed Expansion Project For Manufacturing Of Drugs and Their Intermediates… — lapsed, 200 m away
- Macsen Labs Limited Unit-2 — more information requested, 300 m away
- Proposed Synthetic Organic Chemicals manufacturing unit of Unsaturated… — environmental approval granted, 400 m away
- Proposed Synthetic Organic Chemicals manufacturing unit of Unsaturated… — cleared for impact study, 400 m away
- Macsen Labs Limited Unit 3 — more information requested, 500 m away
- Project by Rotam Crop protection Pvt. Ltd. — initial checks, 650 m away
- Industrial project by M/S Shri Gulab Agri Products — environmental approval granted, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.