What is Developing? Open the mapMap

Cleared for impact studyIndustry · Alwar, Rajasthan

Expansion in production capacity of existing thermosetting Plastic Moulding Powder Manufacturing Unit from 360 MT/annum to 1500MT/annum

Expansion in production capacity of existing thermosetting Plastic Moulding Powder Manufacturing Unit from 360 MT/annum to 1500MT/annum is a proposed industrial project in Bandhapur, Tijara, Alwar, Rajasthan. The site covers 0.2 acres. Its stated project cost is ₹1.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Feb 2023).

See it on the live map All projects in Alwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since16 Feb 2023
Application filed16 Feb 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKhushdeep Chopra
Land area1,000 m²
Project cost₹1.4 crore
Village / localityBandhapur
Taluk / tehsilTijara
DistrictAlwar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-02215

In context

127 applications in Alwar since January 2022 are in the same category (Industry): 93 approved, 18 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 99% of them.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bandhapur, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.