Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Dec 2023 |
| Application filed | 8 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gaurang Goyal |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2 crore |
| Village / locality | Kuthara Khurd |
| Taluk / tehsil | Bassi |
| District | Jaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-02228 |
In context
1,151 applications in Jaipur since January 2022 are in the same category (Mining): 726 approved, 60 filed or under review, and 365 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 5.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Kuthara Khurd, Bassi, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Virendra Kumar [masonry Stone Mining Project, Proposed Production… — environmental approval granted, 0 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing Masonary… — lapsed, 200 m away
- Re-Appraisal of EC Granted from DEIAA Jaipur To SEIAA, Rajasthan, For Existing… — environmental approval granted, 250 m away
- In-situ Slum Redevelopment Project under Rajiv Awas Yojna at Khasra No. 680,… — environmental approval granted, 5.2 km away
- M/s Samar Enterprises (Old Name Shri Ashok Kumar Verma), M.L No. 170/2002,… — environmental approval granted, 6.1 km away
- Transfer Ec From Shri Ashok Kumar Verma to M/s Samar Enterprises, M.L. No.-… — lapsed, 6.1 km away
- "Transfer of EC from Smt. Naina Devi W/o Shri Prabhu Dayal Karol to M/s Shree… — lapsed, 6.3 km away
- Institutional Project — cleared for impact study, 6.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.