Quick answers
What is this project?
Proposed 500 KLPD Grain based Ethanol Plant by M/s Anita Greenfuels Private Limited is an approved industrial project in Chak 3 Lk, Hanumangarh, Rajasthan. The site covers 24.3 acres.
Who is building it?
The applicant is Anita Greenfuels Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Aug 2023), as of 27 Nov 2026.
Where is it?
In Chak 3 Lk, Hanumangarh, Rajasthan.
How big is it?
It has a stated cost of ₹848.3 crore and a site of 24.3 acres.
When was it filed?
The application was filed on 6 Jul 2023.
Project details
| Official title | Proposed 500 KLPD Grain based Ethanol Plant along with 14 MW Co-generation Power Plant under Ethanol Blending Programme at Village 3 LK, Tehsil & District Hanumangarh, Rajasthan by M/s Anita Greenfuels Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 Aug 2023 |
| Application filed | 6 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Anita Greenfuels Private Limited |
| Land area | 24.3 acres (9.9 ha) |
| Project cost | ₹848.3 crore |
| Village / locality | Chak 3 Lk |
| Taluk / tehsil | Hanumangarh |
| District | Hanumangarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-02276 |
In context
13 applications in Hanumangarh since January 2022 are in the same category (Industry): 12 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.3 acres, this one is larger than 77% of them.
Where it is
Chak 3 Lk, Hanumangarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 220 KV S/C Hanumangarh (400 KV GSS) - Rawatsar (220 KV GSS) Transmission Line,… — initial checks, 12.3 km away
- Proposed 1320 KLPD Grain based Ethanol Plant by M/s Dune Ethanol Private Limited — environmental approval granted, 27.1 km away
- Proposed Expansion of Chemical Manufacturing Unit of Hydrazine Hydrate from… — cleared for impact study, 31.3 km away
- SPL ADDITIVES PVT.LTD. -Proposed Chemical Manufacturing Unit of Hydrazine… — environmental approval granted, 31.3 km away
- Proposed Expansion of Chemical Manufacturing Unit of Hydrazine Hydrate from… — environmental approval granted, 31.3 km away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — lapsed, 31.4 km away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — cleared for impact study, 31.4 km away