Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jul 2023 |
| Application filed | 14 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Surinder Kumar |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Jugrawar |
| Taluk / tehsil | Ramgarh |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-02352 |
In context
347 applications in Alwar since January 2022 are in the same category (Mining): 131 approved, 47 filed or under review, and 169 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 95% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Jugrawar, Ramgarh, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Masonry Stone STP Mining Project, STP No. – 26/2024, Ref. No. -… — environmental approval granted, 100 m away
- Masonry Stone STP Mining Project, STP No. – 28/2024, Ref. No. -… — environmental approval granted, 150 m away
- Masonry Stone Mining Project, STP No. – 31/2024, Ref. No. - 202410000114640,… — environmental approval granted, 200 m away
- Shri Rakesh Nehra S/o Shri Chote Lal Nehra, M.L No. 503/2003, Area 1.00 Hect.,… — lapsed, 3.9 km away
- Shri Rakesh Nehra S/o Shri Chote Lal Nehra, M.L No. 503/2003, Area 1.00 Hect.,… — lapsed, 3.9 km away
- Proposed Masonry Stone Mining Project, REF. No.-20221000059099, M.L… — more information requested, 3.9 km away
- Expansion of Existing "Municipal Solid Waste Processing Plant (Composting,… — lapsed, 5.4 km away
- Expansion of Existing "Municipal Solid Waste Processing Plant (Composting,… — cleared for impact study, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.