Quick answers
What is this project?
This withdrawn mining project by M/s Shiv Stone Crusher, ML No.07/2018,Village: Chhapra, Tehsil: Pahari, Dist: Bharatpur (Raj.) is in Chhapra, Pahari, Bharatpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is M/S Shiv Stone Crusher.
Has it been approved?
No. The application was withdrawn on 10 May 2023, so it is no longer under consideration.
Where is it?
In Chhapra, Pahari, Bharatpur, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 10 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s Shiv Stone Crusher, ML No.07/2018,Village: Chhapra, Tehsil:…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 10 May 2023 |
| Application filed | 10 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S Shiv Stone Crusher |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2 crore |
| Village / locality | Chhapra |
| Taluk / tehsil | Pahari |
| District | Bharatpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-02472 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 May 2023 | Environmental approval granted | 2.5 acres | ₹2 crore |
| Early planning filed 10 May 2023 (this page) | Withdrawn | 2.5 acres | ₹2 crore |
In context
945 applications in Bharatpur since January 2022 are in the same category (Mining): 401 approved, 81 filed or under review, and 463 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 94% of them.
33 other mining leases have applied within 500 m of this site; together with this one they cover 84 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 287 mining leases have applied within 5 km.
Where it is
Chhapra, Pahari, Bharatpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Shiv Stone Crusher, ML No.07/2018,Village: Chhapra,… — environmental approval granted, 0 m away
- M/s Shiv Jhirka Stone, Masonary Stone Mine interlinked with Crusher and… — environmental approval granted, 100 m away
- Shri Manoj Kumar Sharma, Masonary Stone Mining Project (M.L. No.- 12/2018 &… — environmental approval granted, 100 m away
- Shri Neeraj Kumar Singh, Masonary Stone Mine interlinked with Crusher and… — environmental approval granted, 100 m away
- Shri Neeraj Kumar Singh, Masonary Stone Mine cluster interlinked with Crusher… — environmental approval granted, 150 m away
- Shri Swaroop Chandra , ML No.5/2018, Village: Chhapra, Tehsil: Pahari, Dist:… — environmental approval granted, 150 m away
- Shri Neeraj Kumar Singh, Masonary Stone Mine interlinked with Crusher (M.L.… — environmental approval granted, 200 m away
- "Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan existing… — environmental approval granted, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.