What is Developing? Open the mapMap

Cleared for impact studyMining · Nagaur, Rajasthan

This is a Fresh proposal for "Granite (Minor Mineral) mining project" [M.L. No.- 07/2023 , Plot No.- 83 ] over an Area of 1.20 Hectares located Near Village– Surajgarh, Tehsil- Riyanbadi & District– Nagaur (Rajasthan) with Proposed Production Capacity– 1,22,052 TPA (ROM) {Saleable Granite –73,231 TPA and Waste– 48,821 TPA } by M/s Maa Nagnechi Mines and Minerals Pvt. Ltd.

This is a Fresh proposal for "Granite (Minor Mineral) mining project" [M.L. No.- 07/2023 , Plot No.- 83 ] over an Area of 1.20 Hectares located Near Village– Surajgarh, Tehsil- Riyanbadi & District– Nagaur (Rajasthan) with Proposed Production Capacity– 1,22,052 TPA (ROM) {Saleable Granite –73,231 TPA and Waste– 48,821 TPA } by M/s Maa Nagnechi Mines and Minerals Pvt. Ltd is a proposed mining project in Bijathal, Riyan Badi, Nagaur, Rajasthan. The site covers 3 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 15 Mar 2024).

See it on the live map All projects in Nagaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since15 Mar 2024
Application filed20 Feb 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDariya Kanwar
Land area3 acres (1.2 ha)
Project cost₹1.5 crore
Village / localityBijathal
Taluk / tehsilRiyan Badi
DistrictNagaur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-03762

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Jul 2025Lapsed3 acres₹1.5 crore
Early planning filed 20 Feb 2024 (this page)Cleared for impact study3 acres₹1.5 crore

In context

2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is larger than 65% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 13.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.

Where it is

Bijathal, Riyan Badi, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.