Quick answers
What is this project?
This is Proposed Quarry licence Sand stone Mining Project, QL.-Plot No 158,Khasra No. 320, Area- 1.348 Ha.(Govt. Land ), Near Village- Khirja Fateh Singh ,Tehsil:- Shergarh , District .:- Jodhpur (Raj.) Of Applicant Shri. Ram Crusher Industry. Prop-Shri Dungar Ram Badiyasar S/o Shri Birmaram Jat is a proposed mining project in Khirja Fathesingh, Shergarh, Jodhpur, Rajasthan. The site covers 3.3 acres.
Who is building it?
The applicant is Dungar Ram.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Apr 2025), as of 27 Nov 2026.
Where is it?
In Khirja Fathesingh, Shergarh, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 3.3 acres.
When was it filed?
The application was filed on 9 Apr 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Apr 2025 |
| Application filed | 9 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dungar Ram |
| Land area | 3.3 acres (1.4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Khirja Fathesingh |
| Taluk / tehsil | Shergarh |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-04888 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Apr 2026 | Lapsed | 3.3 acres | ₹1 crore |
| Early planning filed 9 Apr 2025 (this page) | Cleared for impact study | 3.3 acres | ₹1 crore |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 3.3 acres, this one is larger than 96% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 10.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3,409 mining leases have applied within 5 km.
Where it is
Khirja Fathesingh, Shergarh, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- This is Proposed Quarry licence Sand stone Mining Project, QL.-Plot No… — lapsed, 0 m away
- Khirjan Fatehsingh Sandstone Quarry ,Plot No. 149, Near Village Khirjan… — cleared for impact study, 300 m away
- Proposed Sand Stone Mining Project Q.L.Plot No 121, Area 1.00 Ha , Near… — lapsed, 450 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Jodhpur (Rajasthan)… — lapsed, 500 m away
- Proposed SandStone Mining Project, Plot No .-124, Area: 1.00 Hect. ,Near… — lapsed, 500 m away
- Proposed Masonry Stone Mining Project, Plot No.- 187, Area: 2.75 Hect. - Near… — lapsed, 500 m away
- Proposed Sandstone Mining Project; Q.L Plot No.- 111, Area: 1.0 Hect., Near… — lapsed, 550 m away
- Proposed Sandstone Mining Project, Quarry Licence Plot No.- 116, Area- 1.0… — lapsed, 550 m away
More from Dungar Ram in Jodhpur
- Dungar Ram S/O Khema Ram Chaoudhary Ql No. 321 Pabumagra — environmental approval granted
- Ql 227 Bkt Balesar Dunger Ram — lapsed
- Ql No 83 Area Kalor Old — lapsed
- 114,Bhuri B — lapsed
- Ql No 479 Somanada Dungar Ram — lapsed
- Transfer of Environment Clearance (From Pushpa Kanwar W/o Shri Shankar Singh… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.