Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Mar 2025 |
| Application filed | 19 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manbir Singh Minhas |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Parana |
| Taluk / tehsil | Talera |
| District | Bundi |
| State | Rajasthan |
| Location from | Site area on record |
| Our reference | WID-RJ-04914 |
In context
865 applications in Bundi since January 2022 are in the same category (Mining): 460 approved, 104 filed or under review, and 301 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is smaller than 96% of them.
33 other mining leases have applied within 500 m of this site; together with this one they cover 128.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 267 mining leases have applied within 5 km.
Where it is
Parana, Talera, Bundi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sh. Randhir Singh, ML. No. 181/2010, Sand Stone Mining Project — environmental approval granted, 50 m away
- Shri Randheer Singh, M.L. NO. – 75/2011,Re-appraisal of Environment Clearance… — environmental approval granted, 150 m away
- Shri Nasir Mohammed M.L No- 87/1993 Re-Appraisal of Environment Clearance… — environmental approval granted, 200 m away
- Re-appraisal of Existing Sandstone Mining Project, MLNo. 184/1994, Lease Area… — environmental approval granted, 200 m away
- Re-appraisal of Existing Sandstone Mining Project ML No. 200/1995 , Lease area… — environmental approval granted, 250 m away
- Re-appraisal of earlier EC Granted by DEIAA Bundi F-1/DEIAA/Bundi/2016/1920-50… — lapsed, 250 m away
- Proposed Enhancement in Existing Production Capacity from 9424 TPA (ROM) to… — lapsed, 250 m away
- Proposed Enhancement in Existing Production Capacity from 9424 TPA (ROM) to… — withdrawn, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.