Quick answers
What is this project?
Existing Lime Stone Mining Project, M.L. No. 19/1992, Area; -9.0 ha. (Govt. Land), Khasra No. 225, Near Village:- Murkasani, Tehsil:- Bilara, Dist.:- Jodhpur (Raj.) of Applicant M/s Shri Sahdev Chemical & Allied Products is a proposed mining project in Jhak, Bilara, Jodhpur, Rajasthan. The site covers 22.2 acres.
Who is building it?
The applicant is Shri Sahadev Chemical and Allied Products.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Mar 2025), as of 27 Nov 2026.
Where is it?
In Jhak, Bilara, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 22.2 acres.
When was it filed?
The application was filed on 17 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Existing Lime Stone Mining Project, M.L. No. 19/1992, Area; -9.0 ha. (Govt. Land),…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Mar 2025 |
| Application filed | 17 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shri Sahadev Chemical and Allied Products |
| Land area | 22.2 acres (9 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Jhak |
| Taluk / tehsil | Bilara |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-04934 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Jul 2025 | Environmental approval granted | 22.2 acres | ₹2.2 crore |
| Early planning filed 17 Jan 2025 (this page) | Cleared for impact study | 22.2 acres | ₹2.2 crore |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 22.2 acres, this one is larger than 99% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 42 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.
Where it is
Jhak, Bilara, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Lime Stone Mining Project, M.L. No. 19/1992, Area; -9.0 ha. (Govt.… — environmental approval granted, 0 m away
- Proposed Enhancement in Production Capacity from 2,31,705 TPA to 3,99,501 TPA… — lapsed, 400 m away
- Re-Appraisal of EC Granted from DEIAA Jodhpur to SEIAA Rajasthan Existing… — environmental approval granted, 400 m away
- Jhak Limestone Mine (M.L.No.26/1994, Area 4.99 Hect.) of Shri Moor Mohammed — environmental approval granted, 600 m away
- Jhak Murkasani Block (JMK-03) for Limestone mineral over an area of 4.35 Ha.… — environmental approval granted, 750 m away
- Jhak Murkasani Block (JMK-03) for Limestone mineral over an area of 4.35 Ha.… — withdrawn, 750 m away
- Jhak Murkasani Block (JMK-03) for Limestone mineral over an area of 4.35 Ha.… — environmental approval granted, 750 m away
- Jhak Murkasani Block (JMK-03) for Limestone mineral over an area of 4.35 Ha.… — cleared for impact study, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.