What is Developing? Open the mapMap

Cleared for impact studyMining · Nagaur, Rajasthan

Proposed 3C2 Limestone Block (Auctioned Block) (Area 386.0215 Ha.) with Limestone Production Capacity: 2.50 Million TPA, OB/IB/Waste: 2.80 Million TPA, Top Soil: 0.38 Million TPA (Total Excavation: 5.68 Million TPA) by M/s. JSW Cement Ltd

Proposed 3C2 Limestone Block (Auctioned Block) (Area 386.0215 Ha.) with Limestone Production Capacity: 2.50 Million TPA, OB/IB/Waste: 2.80 Million TPA, Top Soil: 0.38 Million TPA (Total Excavation: 5.68 Million TPA) by M/s. JSW Cement Ltd is a proposed mining project in Harima, Nagaur, Rajasthan. The site covers 953.9 acres. Its stated project cost is ₹203.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 1 Oct 2024).

See it on the live map All projects in Nagaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed 3C2 Limestone Block (Auctioned Block) (Area 386.0215 Ha.) with Limestone Production Capacity: 2.50 Million TPA, OB/IB/Waste: 2.80 Million TPA, Top Soil: 0.38 Million TPA (Total Excavation: 5.68 Million TPA) along with Installation of Crusher 1600 TPH with Wobbler located at Villages: Harima & Deh, Tehsil: Nagaur & Deh, District: Nagaur, Rajasthan. by M/s. JSW Cement Ltd.
StatusCleared for impact study
Status since1 Oct 2024
Application filed8 Jul 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantManoj Rustagi
Land area953.9 acres (386 ha)
Project cost₹203.5 crore
Village / localityHarima
Taluk / tehsilNagaur
DistrictNagaur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-05186

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 Oct 2025Lapsed953.9 acres₹203.5 crore
Amendment filed 8 Jul 2024 (this page)Cleared for impact study953.9 acres₹203.5 crore
Early planning filed 27 Nov 2023Cleared for impact study953.9 acres₹203.5 crore

In context

2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 953.9 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.

Where it is

Harima, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Manoj Rustagi in Nagaur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.