Quick answers
What is this project?
Regarding Expansion in Production Capacity from 1,17,700TPA to 3,69,550TPA (ROM) of our Existing Limestone Mining Project; M.L. No.- 54/2009, Area: 4.50Hect. Near Village- Digrana, Tehsil- Jaitaran, District- Pali (Raj.) in favor of Shri Chandra Prakash S/o Shri Mohan Lal Saini is an approved mining project in Digrana, Jaitaran, Pali, Rajasthan. The site covers 11.1 acres.
Who is building it?
The applicant is Chandraprakash.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Sept 2024), as of 27 Nov 2026.
Where is it?
In Digrana, Jaitaran, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 11.1 acres.
When was it filed?
The application was filed on 21 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Sept 2024 |
| Application filed | 21 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chandraprakash |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Digrana |
| Taluk / tehsil | Jaitaran |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-05718 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.1 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 20 have applied within 5 km.
Where it is
Digrana, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Limestone Mineral an area of 4.5 ha; expansion of production capacity from… — lapsed, 0 m away
- Limestone Mineral an area of 4.5 ha; expansion of production capacity from… — withdrawn, 0 m away
- Transfer of Earlier Granted EC from Shivcharan Singh S/o Shri Ganga Singh to… — environmental approval granted, 500 m away
- Re-Appraisal of Exiting Lime Stone Mining Project, M.L.No 01/1996 Area-4.80 Ha… — environmental approval granted, 550 m away
- Transfer of Mine EC from M/s. Siddhi Vinayak Cement Limited to M/. Nuvoco… — withdrawn, 1.4 km away
- Reappraisal of the EC granted by DEIAA Jodhpur for Lime Stone Mining Project,… — environmental approval granted, 1.6 km away
- Transfer of Mine EC from M/s. Siddhi Vinayak Cement Limited to M/s. Nuvoco… — lapsed, 1.9 km away
- Reappraisal of Earlier Granted EC By DEIAA, Jodhpur (Raj.) Vide Letter No.… — environmental approval granted, 2.1 km away
More from Chandraprakash in Pali
- Limestone Mineral an area of 4.5 ha; expansion of production capacity from… — lapsed
- Limestone Mineral an area of 4.5 ha; expansion of production capacity from… — withdrawn