What is Developing? Open the mapMap

LapsedMining · Jodhpur, Rajasthan

EC TRANSFER OF EXISTING SAND STONE MINING PROJECT(QL NO 1186, AREA-BKT 0.18 Ha, PRODUCTION CAPACITY 1710 TPA(ROM),N/v BRAHMANO KA TANKA, TEHSIL-BALESAR, DISTRICT-JODHPUR(RAJ), FROM SHRI DUNGAR SINGH TO SHRI CHAMPA KANWAR

EC TRANSFER OF EXISTING SAND STONE MINING PROJECT(QL NO 1186, AREA-BKT 0.18 Ha, PRODUCTION CAPACITY 1710 TPA(ROM),N/v BRAHMANO KA TANKA, TEHSIL-BALESAR, DISTRICT-JODHPUR(RAJ), FROM SHRI DUNGAR SINGH TO SHRI CHAMPA KANWAR is a lapsed mining project in Amrit Nagar, Balesar, Jodhpur, Rajasthan. The site covers 0.4 acres. Its stated project cost is ₹5 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 13 Aug 2025).

See it on the live map All projects in Jodhpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

EC TRANSFER OF EXISTING SAND STONE MINING PROJECT(QL NO 1186, AREA-BKT 0.18 Ha, PRODUCTION CAPACITY 1710 TPA(ROM),N/v BRAHMANO KA TANKA, TEHSIL-BALESAR, DISTRICT-JODHPUR(RAJ), FROM SHRI DUNGAR SINGH TO SHRI CHAMPA KANWAR is a lapsed mining project in Amrit Nagar, Balesar, Jodhpur, Rajasthan. The site covers 0.4 acres.

Who is building it?

The applicant is Champa Kanwar.

Has it been approved?

No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.

Where is it?

In Amrit Nagar, Balesar, Jodhpur, Rajasthan.

How big is it?

It has a stated cost of ₹5 lakh and a site of 0.4 acres.

When was it filed?

The application was filed on 27 Aug 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: EC TRANSFER OF EXISTING SAND STONE MINING PROJECT(QL NO 1186, AREA-BKT 0.18 Ha,…

Project details

StatusLapsed
Status since13 Aug 2025
Application filed27 Aug 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantChampa Kanwar
Land area1,800 m²
Project cost₹5 lakh
Village / localityAmrit Nagar
Taluk / tehsilBalesar
DistrictJodhpur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-05860

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Jun 2025Lapsed0.4 acres₹5 lakh
Ownership transfer filed 27 Aug 2024 (this page)Lapsed0.4 acres₹5 lakh

In context

11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.4 acres, this one is smaller than 98% of them.

387 other mining leases have applied within 500 m of this site; together with this one they cover 171.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3,315 mining leases have applied within 5 km.

Where it is

Amrit Nagar, Balesar, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Champa Kanwar in Jodhpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.