Quick answers
What is this project?
Re Appraisal of EC granted by DEIAA, Bikaner (Rajasthan), of Existing Gravel (Bajri) Mining Project, M.L. No.-177/2009, Area:3.00 Hect.,Production Capacity – 2,00,000 TPA Near Village:- Modia Mansar, Tehsil- Kolayat, District- Bikaner (Raj.) in favor of Sh. Karna Ram Jat S/o Sh. Bhanwara Ram Jat is an approved mining project in Gajner, Kolayat, Bikaner, Rajasthan. The site covers 7.4 acres.
Who is building it?
The applicant is Karna Ram Jat.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Jun 2025), as of 27 Nov 2026.
Where is it?
In Gajner, Kolayat, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 22 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Jun 2025 |
| Application filed | 22 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Karna Ram Jat |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Gajner |
| Taluk / tehsil | Kolayat |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-06250 |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.4 acres, this one is smaller than 83% of them.
No other mining lease on record is within 500 m of this site; 24 have applied within 5 km.
Where it is
Gajner, Kolayat, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Appraisal of EC Granted from DIEAA Bikaner of Gravel Bajri (Minor Mineral)… — environmental approval granted, 800 m away
- Re Appraisal of EC Granted from DEIAA, Bikaner, of "Gravel & Bajri (Minor… — lapsed, 900 m away
- Proposed Ball Clay, Silica Sand, Bajri, Murrum Mining lease (ML No. 35/2025… — under environmental review, 1.7 km away
- Proposed Ball Clay, Silica Sand, Bajri, Murrum Mining lease (ML No. 35/2025… — under environmental review, 1.7 km away
- Bajri, Ball Clay, Silica Sand, (Minor Mineral) Mining Project (Ref No.-… — cleared for impact study, 2.1 km away
- Ball Clay, Silica Sand, Gravel, Kankar and Murrum Mining Project (Ref. No.… — environmental approval granted, 2.2 km away
- This is a Fresh Proposal for "Silica Sand & Bajri (Minor Mineral) Mining… — lapsed, 2.4 km away
- Proposed Ballclay, Gravel and Silica Sand Mining Project; Reference No.-… — lapsed, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.