Project details
| Official title | Proposed Industrial Area at Village Amberi, Tehsil Girwa, District Udaipur, Rajasthan by Rajasthan State Industrial Development and Investment Corporation Limited (RIICO) Unit Udaipur, Distt. Udaipur (Raj.) |
|---|---|
| Status | Cleared for impact study |
| Status since | 3 Jun 2025 |
| Application filed | 17 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Ajay Pandya |
| Use | Industrial |
| Land area | 124 acres (50.2 ha) |
| Plot area | 5,01,675 m² (53,99,980 sq ft) |
| Project cost | ₹55.9 crore |
| Village / locality | Amberi |
| Taluk / tehsil | Badgaon |
| District | Udaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-06443 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 May 2026 | Lapsed | 124 acres | ₹55.9 crore |
| Early planning filed 17 Dec 2024 (this page) | Cleared for impact study | 124 acres | ₹55.9 crore |
In context
54 applications in Udaipur since January 2022 are in the same category (Buildings & townships): 26 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 124 acres, this one is larger than 80% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amberi, Badgaon, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Area — lapsed, 0 m away
- Expansion & Revision for commercial project "Urban Square" — environmental approval granted, 3 km away
- Existing Unsaturated Polyester Resin manufacturing unit situated at Plot no.… — returned to applicant, 3.2 km away
- Proposed Group Housing Project by Silver Spring Construction Private Limited — environmental approval granted, 4.1 km away
- Proposed Residential Flats Building Project "Swarna bhoomi Residency" of M/s… — environmental approval granted, 4.2 km away
- Aishwaryam Residency — environmental approval granted, 4.7 km away
- Inner Lakhawali Soapstone Mine — environmental approval granted, 5.1 km away
- Sonaria Soapstone Mine — lapsed, 5.2 km away
More from Ajay Pandya in Udaipur
- Proposed industrial area Amli phase- II, village Amli, Tehsil: Mavli, District… — lapsed
- Proposed industrial area Amli phase- II, village Amli, Tehsil: Mavli, District… — returned to applicant
- Proposed industrial area Amli phase- II, village Amli, Tehsil: Mavli, District… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.