Tor for Addition of Strip Land in Existing Red Ochre Mining Project (Existing Area-3.9835 ha. + Strip Land – 0.4185 ha.Total Area :- 4.402 ha) and Expansion in Production Capacity from 1,63,761 to 3,26,071 M.L No.-02/2018 Area: 4.402 Hect. ; Village Pagara ,Tehsil -Bhadesar & District -Chittorgarh (Rajasthan). in favour of Shri Ashish Dhing S/o Late Shri Basanti Lal Dhing & Shri Nishant Sharma S/o Shri Mahesh Chand Sharma

Tor for Addition of Strip Land in Existing Red Ochre Mining Project (Existing Area-3.9835 ha. + Strip Land – 0.4185 ha.Total Area :- 4.402 ha) and Expansion in Production Capacity from 1,63,761 to 3,26,071 M.L No.-02/2018 Area: 4.402 Hect. ; Village Pagara ,Tehsil -Bhadesar & District -Chittorgarh (Rajasthan). in favour of Shri Ashish Dhing S/o Late Shri Basanti Lal Dhing & Shri Nishant Sharma S/o Shri Mahesh Chand Sharma is a proposed mining project in Pagara, Bhadesar, Chittaurgarh, Rajasthan. The site covers 10.9 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 15 Sept 2024).

See it on the live map All projects in Chittaurgarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Tor for Addition of Strip Land in Existing Red Ochre Mining Project (Existing Area-3.9835 ha. + Strip Land – 0.4185 ha.Total Area :- 4.402 ha) and Expansion in Production Capacity from 1,63,761 to 3,26,071 M.L No.-02/2018 Area: 4.402 Hect. ; Village Pagara ,Tehsil -Bhadesar & District -Chittorgarh (Rajasthan). in favour of Shri Ashish Dhing S/o Late Shri Basanti Lal Dhing & Shri Nishant Sharma S/o Shri Mahesh Chand Sharma is a proposed mining project in Pagara, Bhadesar, Chittaurgarh, Rajasthan. The site covers 10.9 acres.

Who is building it?

The applicant is Ashish Dhing.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 15 Sept 2024), as of 27 Nov 2026.

Where is it?

In Pagara, Bhadesar, Chittaurgarh, Rajasthan.

How big is it?

It has a stated cost of ₹90 lakh and a site of 10.9 acres.

When was it filed?

The application was filed on 3 Aug 2024.

Project details

StatusCleared for impact study
Status since15 Sept 2024
Application filed3 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAshish Dhing
Land area10.9 acres (4.4 ha)
Project cost₹90 lakh
Village / localityPagara
Taluk / tehsilBhadesar
DistrictChittaurgarh
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-06975

In context

2,142 applications in Chittaurgarh since January 2022 are in the same category (Mining): 1,206 approved, 59 filed or under review, and 877 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 10.9 acres, this one is larger than 59% of them.

5 other mining leases have applied within 500 m of this site; together with this one they cover 643.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 33 mining leases have applied within 5 km.

Where it is

Pagara, Bhadesar, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ashish Dhing in Chittaurgarh

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.