Quick answers
What is this project?
Proposed Masonry Stone Mining Project; Plot No.- 95, Area: 1.0 Hect., Near Village- Juni Aati, Tehsil- Barmer & District- Barmer (Raj.) in favor of Shri Punam Chand S/o Shri Bharmal Bishnoi is a lapsed mining project in Juneeaati, Barmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Poonam Chand Bishnoi.
Has it been approved?
No. The application was lapsed on 14 Feb 2025, so it is no longer under consideration.
Where is it?
In Juneeaati, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 9 Sept 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Feb 2025 |
| Application filed | 9 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Poonam Chand Bishnoi |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Juneeaati |
| Taluk / tehsil | Barmer |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-07056 |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
27 other mining leases have applied within 500 m of this site; together with this one they cover 491.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 40 mining leases have applied within 5 km.
Where it is
Juneeaati, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Juni Aati Masonary stone (Minor Mineral) Mining Project Khasra no. 579/321… — environmental approval granted, 0 m away
- Masonary Stone (Minor Mineral) Mining Project in Cluster — environmental approval granted, 50 m away
- Transfer of Environment Clearance of Existing Masonry Stone Mining project… — lapsed, 50 m away
- Masonary Stone (Minor Mineral) Mining Project in Cluster — environmental approval granted, 50 m away
- Masonary Stone (Minor Mineral) Mining Project in Cluster — environmental approval granted, 50 m away
- Juni Aati Masonary stone (Minor Mineral) Mining Project Khasra no. 579/321… — lapsed, 50 m away
- Masonary Stone (Minor Mineral) Mining Project in Cluster — environmental approval granted, 100 m away
- Juni Aati Masonry Stone Mining Project, Plot No. 97, — cleared for impact study, 100 m away
More from Poonam Chand Bishnoi in Barmer
- Proposed Masonry Stone Mining Project; Plot No.- 105, Area: 1.0 Hect., Near… — lapsed
- Proposed Masonry Stone Mining Project; Plot No.- 102, Area: 1.0 Hect., Near… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.