Quick answers
What is this project?
Proposed Iron Ore Beneficiation Plant of capacity 1.5 MTPA coming up at Khasra Nos. 389/322, 354, 327, 353, 353/384, 367, 369, Village- Ramliyawas, Tehsil- Neem Ka Thana, District-Sikar (Rajasthan) is a proposed mining project in Kishanpura, Sri Madhopur, Sikar, Rajasthan. The site covers 90.3 acres.
Who is building it?
The applicant is Growth Industrial Minerals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Aug 2024), as of 27 Nov 2026.
Where is it?
In Kishanpura, Sri Madhopur, Sikar, Rajasthan.
How big is it?
It has a stated cost of ₹500 crore and a site of 90.3 acres.
When was it filed?
The application was filed on 1 Aug 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Aug 2024 |
| Application filed | 1 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Growth Industrial Minerals Private Limited |
| Land area | 90.3 acres (36.6 ha) |
| Project cost | ₹500 crore |
| Village / locality | Kishanpura |
| Taluk / tehsil | Sri Madhopur |
| District | Sikar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-07552 |
In context
837 applications in Sikar since January 2022 are in the same category (Mining): 470 approved, 62 filed or under review, and 305 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 90.3 acres, this one is larger than 98% of them.
No other mining lease on record is within 500 m of this site; 65 have applied within 5 km.
Where it is
Kishanpura, Sri Madhopur, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Masonry Stone Mining Project, Plot No.- 24" with Production… — cleared for impact study, 550 m away
- "Masonry Stone" (Minor Mineral) Mining Project — under environmental review, 550 m away
- Proposed "Masonry Stone Mining Project, Delineated Plot No.- 27" with… — cleared for impact study, 850 m away
- Proposed Iron Ore Mine, ML No. 140/2011 coming up — environmental approval granted, 850 m away
- Proposed Iron Ore Mine, ML No. 140/2011 coming up — cleared for impact study, 850 m away
- Proposed Iron Ore Mine, ML No. 140/2011 coming up — environmental approval granted, 850 m away
- Proposed Iron Ore Mine, ML No. 140/2011 — withdrawn, 850 m away
- Proposed Iron Ore Mine, ML No. 140/2011 — withdrawn, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.