Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Mar 2025 |
| Application filed | 28 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gopal Kumar |
| Land area | 201.2 acres (81.4 ha) |
| Project cost | ₹9 crore |
| Village / locality | Lunol |
| Taluk / tehsil | Reodar |
| District | Sirohi |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-08469 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Dec 2025 | Under environmental review | 201.2 acres | ₹9 crore |
| Early planning filed 28 Mar 2025 (this page) | Cleared for impact study | 201.2 acres | ₹9 crore |
In context
511 applications in Sirohi since January 2022 are in the same category (Mining): 274 approved, 42 filed or under review, and 195 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 201.2 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 95 have applied within 5 km.
Where it is
Lunol, Reodar, Sirohi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Sand (Bajri) Mining Project — under environmental review, 200 m away
- Re-Appraisal of the EC Granted By DEIAA Sirohi For Marble Mining Project ML… — lapsed, 1.7 km away
- Shri Maan Singh M.L.No. 23/1999, Transfer In Environment Clearance marble… — lapsed, 1.7 km away
- Shri Maan Singh Barhat, M.L. No. 16/1995, Re-appraisal of EC granted by DEIAA… — environmental approval granted, 1.7 km away
- Shri Maan Singh Barhat, M.L. No. 16/1995, Re-appraisal of EC granted by DEIAA… — withdrawn, 1.7 km away
- Maan Singh Barhat, Re-appraisal Marble Mining Project (M.L. No. 23/1999) — environmental approval granted, 1.8 km away
- Reappraisal of the EC granted by DEIAA Sirohi for Marble Mining Project, M.L.… — lapsed, 1.8 km away
- SN Marble Factory, M.L.No.187/1990, Re-appraisal of EC granted by DEIAA to… — environmental approval granted, 1.8 km away
More from Gopal Kumar in Sirohi
- Phalwadi Granite Mine (ML. No.: 08/2023) — lapsed
- Phalwadi Granite Mine (ML. No.: 07/2023) — lapsed
- Phalwadi Granite Mine (M.L. No.: 18/2023) — lapsed
- Phalwadi Granite Mine (M.L. No.: 17/2023) — lapsed
- Phalwadi Granite Mine (M.L. No.: 18/2023) — cleared for impact study
- Phalwadi Granite Mine (M.L. No.: 17/2023) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.