What is Developing? Open the mapMap

Environmental approval grantedMining · Nagaur, Rajasthan

Expansion in Production capacity of Earlier Granted EC Proposed from 66000 TPA to 199425 TPA (ROM) {Saleable– 1, 45,635 TPA, Waste– 7665 TPA, OB- 42187.5 TPA and Soil- 3937.5 TPA}, for Existing, 'Lime Stone' (Minor Mineral) mining project" [M.L.No.-54/2008] over an Area of 3.1276 Hectare by Shri Dilip Kumar Asawa S/o Shri Hari Kishan Asawa

Expansion in Production capacity of Earlier Granted EC Proposed from 66000 TPA to 199425 TPA (ROM) {Saleable– 1, 45,635 TPA, Waste– 7665 TPA, OB- 42187.5 TPA and Soil- 3937.5 TPA}, for Existing, 'Lime Stone' (Minor Mineral) mining project" [M.L.No.-54/2008] over an Area of 3.1276 Hectare by Shri Dilip Kumar Asawa S/o Shri Hari Kishan Asawa is an approved mining project in Dantiya, Kheenvsar, Nagaur, Rajasthan. The site covers 7.7 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 May 2025).

See it on the live map All projects in Nagaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion in Production capacity of Earlier Granted EC Proposed from 66000 TPA to 199425 TPA (ROM) {Saleable– 1, 45,635 TPA, Waste– 7665 TPA, OB- 42187.5 TPA and Soil- 3937.5 TPA}, for Existing, 'Lime Stone' (Minor Mineral) mining project" [M.L.No.-54/2008] over an Area of 3.1276 Hectare located at Near Village– Datina (Deu), Tehsil- Khinwsar, District-Nagaur (Rajasthan-Vi) by Shri Dilip Kumar Asawa S/o Shri Hari Kishan Asawa.
StatusEnvironmental approval granted
Status since23 May 2025
Application filed22 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantDilip Asawa
Land area7.7 acres (3.1 ha)
Project cost₹80 lakh
Village / localityDantiya
Taluk / tehsilKheenvsar
DistrictNagaur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-08748

In context

2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.7 acres, this one is larger than 78% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Dantiya, Kheenvsar, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dilip Asawa in Nagaur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.