Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Sept 2024 |
| Application filed | 3 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shokin Khokhar |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Bhimana |
| Taluk / tehsil | Pindwara |
| District | Sirohi |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-09685 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 13 May 2025 | Lapsed | 9.9 acres | ₹3.3 crore |
| Early planning filed 3 Aug 2024 (this page) | Cleared for impact study | 9.9 acres | ₹3.3 crore |
In context
511 applications in Sirohi since January 2022 are in the same category (Mining): 274 approved, 42 filed or under review, and 195 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.9 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Bhimana, Pindwara, Sirohi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Environmental Clearance for Inclusion of Mineral Granite & Masonry Stone With… — lapsed, 0 m away
- Proposed Rohida Limestone Mine of Kamlesh Meta Cast Private Limited with… — lapsed, 1.7 km away
- Proposed Rohida Limestone Mine of Kamlesh Meta Cast Private Limited with… — cleared for impact study, 1.7 km away
- Proposed Rohida Limestone Mine of Kamlesh Meta Cast Private Limited with… — lapsed, 1.7 km away
- Bhaniyana Construction Company, Plot No. 15/2018, N/v - Bhimana, Tehsil -… — lapsed, 2.7 km away
- Proposed standalone clinker grinding unit of 100 TPD (OPC & PPC) capacity… — cleared for impact study, 3.5 km away
- Amendment in EC of Manufacturing Synthetic Organic Chemicals of Capacity 41… — lapsed, 3.7 km away
- Change in Product Mix Proposal under No Increase in Pollution Load (NIPL) in… — initial checks, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.