What is this project?
Sanderao Masonary Stone Mine, M.L. No. 146/1997", Khasra No.: 1191/1 is an approved mining project in Sanderav, Sumerpur, Pali, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Kishan Singh Ranawat.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Jun 2025), as of 27 Nov 2026.
Where is it?
In Sanderav, Sumerpur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹37 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 13 Jun 2024.
Project details
| Official title | Sanderao Masonary Stone Mine, M.L. No. 146/1997", Khasra No.: 1191/1, at Village: Sanderao, Tehsil –Sumerpur, District: Pali, Rajasthan, Lease Area: 1.00 hectare for proposed production of 66600 Tones of mineral Masonary Stone in favor of Mr. Kishan Singh Ranawat |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Jun 2025 |
| Application filed | 13 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Kishan Singh Ranawat |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹37 lakh |
| Village / locality | Sanderav |
| Taluk / tehsil | Sumerpur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-09853 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 91% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Sanderav, Sumerpur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-appraisal of EC issued by DEIAA for Sanderav Masonary Stone Mine (M.L. NO.:… — environmental approval granted, 0 m away
- Sanderao Masonary Stone Mine (M.L. NO.: 147/1997), Lease Area- 1.00 Hects., at… — lapsed, 200 m away
- Sanderao Masonary Stone Mine (M.L. NO.: 147/1997), Lease Area- 1.00 Hects., at… — lapsed, 200 m away
- EC Re-appraisal of Existing Masonry stone Mining Lease (M.L. No. – 48/2001 &… — environmental approval granted, 6.5 km away
- EC Re-appraisal of Existing Masonry stone Mining Lease (M.L. No. – 72/2001&… — environmental approval granted, 6.5 km away
- Re Appraisal of EC Granted from DEIAA, Pali For Existing Masonary Stone Mining… — environmental approval granted, 6.6 km away
- EC Re-appraisal of Existing Rhyolite Mining Project ML. No. 108/2008, Area:… — environmental approval granted, 6.7 km away
- EC Re-appraisal of Existing Masonry stone Mining Lease (M.L. No. – 78/06 &… — environmental approval granted, 6.7 km away
More from Kishan Singh Ranawat in Pali
- Re-appraisal of EC issued by DEIAA for Sanderav Masonary Stone Mine (M.L. NO.:… — environmental approval granted