Quick answers
What is this project?
Proposed 2,23,000 KLPA Crude oil, Hydrocarbon oil and Base oil based Refinery Plant by M/s. Rahul Petronet Private Limited is a proposed industrial project in Denda, Pali, Rajasthan. The site covers 7.2 acres.
Who is building it?
The applicant is Rahul Petronet Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Sept 2024), as of 27 Nov 2026.
Where is it?
In Denda, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹70 crore and a site of 7.2 acres.
When was it filed?
The application was filed on 27 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 2,23,000 KLPA Crude oil, Hydrocarbon oil and Base oil based Refinery Plant by…
Project details
| Official title | Proposed 2,23,000 KLPA Crude oil, Hydrocarbon oil and Base oil based Refinery Plant at Village Gundoj, Tehsil & District Pali, Rajasthan by M/s. Rahul Petronet Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 20 Sept 2024 |
| Application filed | 27 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rahul Petronet Private Limited |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹70 crore |
| Village / locality | Denda |
| Taluk / tehsil | Pali |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-10510 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jun 2025 | Environmental approval granted | 7.2 acres | ₹70 crore |
| Early planning filed 27 Jun 2024 (this page) | Cleared for impact study | 7.2 acres | ₹70 crore |
In context
13 applications in Pali since January 2022 are in the same category (Industry): 10 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.2 acres, this one is smaller than 69% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Denda, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 2,23,000 KLPA Crude oil, Hydrocarbon oil and Base oil based Refinery… — environmental approval granted, 0 m away
- Reappraisal of Earlier Granted EC By DEIAA, Pali(Raj.) Vide Letter No.… — environmental approval granted, 1.4 km away
- Re Appraisal of EC granted from DEIAA, Pali of Proposed Granite (Minor… — lapsed, 1.4 km away
- Reappraisal of Earlier Granted EC By DEIAA, Pali. Vide Letter No.… — environmental approval granted, 1.5 km away
- "Granite Mining Project, Reference no. 20231000074667" — environmental approval granted, 1.6 km away
- Gundoj-I Granite Applied ML Area in Cluster (REF. NO. 202410000102830, Khasra… — more information requested, 1.9 km away
- Gundoj-I Granite Applied ML Area in Cluster (REF. NO. 202410000102830, Khasra… — cleared for impact study, 1.9 km away
- "Expansion in Area & Production of Mineral for Granite Mining Project M.L No.… — cleared for impact study, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.