LapsedPower · Barmer, Rajasthan

Expansion of Lignite Based Super Critical CFBC Thermal Power Plant from "1080 MW To 2160 MW" by Installing 1080MW (3 X 360 MW) Unit in existing 1080 MW plant at Bhadresh, Barmer, Rajasthan

Expansion of Lignite Based Super Critical CFBC Thermal Power Plant from "1080 MW To 2160 MW" by Installing 1080MW (3 X 360 MW) Unit in existing 1080 MW plant at Bhadresh, Barmer, Rajasthan is a lapsed power project in Bhadres Gandhav, Barmer, Rajasthan. The site covers 1,186 acres. Its stated project cost is ₹13,539 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Barmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Lignite Based Super Critical CFBC Thermal Power Plant from "1080 MW To 2160 MW" by Installing 1080MW (3 X 360 MW) Unit in existing 1080 MW plant at Bhadresh, Barmer, Rajasthan is a lapsed power project in Bhadres Gandhav, Barmer, Rajasthan. The site covers 1,186 acres.

Who is building it?

The applicant is Jsw Energy Barmer Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Bhadres Gandhav, Barmer, Rajasthan.

How big is it?

It has a stated cost of ₹13,539 crore and a site of 1,186 acres.

When was it filed?

The application was filed on 1 Feb 2024.

Project details

StatusLapsed
Status since29 Oct 2024
Application filed1 Feb 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantJsw Energy Barmer Limited
Land area1,186 acres (480 ha)
Project cost₹13,539 crore
Village / localityBhadres Gandhav
Taluk / tehsilBarmer
DistrictBarmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-10740

In context

24 applications in Barmer since January 2022 are in the same category (Power): 8 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 1,186 acres, this one is larger than 57% of them.

Where it is

Bhadres Gandhav, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jsw Energy Barmer Limited in Barmer

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.