EC Re-appraisal of Existing Gravel (Bajri) Mining Project, (M.L. No. 29/2006, Area- 3.0 ha.) at Khasra No.-1165, near village –Govind Nagar (Roda), Tehsil- Nokha & District-Bikaner (Rajasthan) of M/s G.R. Bajri Udhyog

EC Re-appraisal of Existing Gravel (Bajri) Mining Project, (M.L. No. 29/2006, Area- 3.0 ha.) at Khasra No.-1165, near village –Govind Nagar (Roda), Tehsil- Nokha & District-Bikaner (Rajasthan) of M/s G.R. Bajri Udhyog is a lapsed mining project in Rora, Nokha, Bikaner, Rajasthan. The site covers 7.4 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 21 Jul 2025).

See it on the live map All projects in Bikaner

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

EC Re-appraisal of Existing Gravel (Bajri) Mining Project, (M.L. No. 29/2006, Area- 3.0 ha.) at Khasra No.-1165, near village –Govind Nagar (Roda), Tehsil- Nokha & District-Bikaner (Rajasthan) of M/s G.R. Bajri Udhyog is a lapsed mining project in Rora, Nokha, Bikaner, Rajasthan. The site covers 7.4 acres.

Who is building it?

The applicant is Gr Bazari Udhyog.

Has it been approved?

No. The application was lapsed on 21 Jul 2025, so it is no longer under consideration.

Where is it?

In Rora, Nokha, Bikaner, Rajasthan.

How big is it?

It has a stated cost of ₹50 lakh and a site of 7.4 acres.

When was it filed?

The application was filed on 25 Jun 2024.

Project details

StatusLapsed
Status since21 Jul 2025
Application filed25 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantGr Bazari Udhyog
Land area7.4 acres (3 ha)
Project cost₹50 lakh
Village / localityRora
Taluk / tehsilNokha
DistrictBikaner
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-10919

In context

516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.4 acres, this one is smaller than 83% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Rora, Nokha, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.