Project details
| Official title | Smt. Manisha Sharda W/o Shri Sunil Sharda, Existing Masonry Stone Mining Project, ML no.-398/2005, Lease Area– 1.00 Hect, Located at Near Village- Trisingya, Tehsil-Nawa, District-Nagaur, State – Rajasthan, |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Jan 2025 |
| Application filed | 4 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manisha Sarda |
| Land area | 2,700 m² |
| Project cost | ₹10 lakh |
| Village / locality | Trisingiya |
| Taluk / tehsil | Kuchaman City |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-11121 |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.7 acres, this one is smaller than 79% of them.
No other mining lease on record is within 500 m of this site; 26 have applied within 5 km.
Where it is
Trisingiya, Kuchaman City, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Transfer EC of Masonary stone mine ML.No.07/1996 (Transfer Ec from… — lapsed, 600 m away
- Project for Expansion in Production Capacity of Masonary Stone Mine Ml.No.7/1996 — lapsed, 600 m away
- Masonary Stone Mine ML.No.07/1996 — environmental approval granted, 600 m away
- EC Transfer of Masonry Stone Mining Project (M.L. No.- 7/1996 , Area- 1.0 Ha.) — lapsed, 600 m away
- EC Re-appraisal of Existing Masonry Stone Mining Project (M.L. No.- 7/1996 ,… — returned to applicant, 600 m away
- Shri Prakash Sarda S/o Shri Chainsukh Sarda, Existing Masonry Stone Mining… — environmental approval granted, 1.8 km away
- Project for Transfer EC of Masonary stone mine ML.No.01/2004 (Transfer Ec from… — lapsed, 2 km away
- Project for Expansion in Production Capacity of Masonary Stone Mine… — lapsed, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.