Quick answers
What is this project?
This is a fresh proposal of "Bajri, Silica Sand, Gravel, Kankar, Murrum, Ball Clay" (Minor Mineral) Mining Project (ML.No.27/2023) Over an area of 4.9830 ha. with proposed production capacity of 404100 TPA(ROM) {Marketable Ball clay-182250, Bajri- 70200, Silica Sand- 70200, Gravel/Murram/Kankar- 46800, Total Rejects- 20250 and waste- 14400located by Shree Ashok Kumar S/o Shree Mangi Lal is a proposed mining project in Samorakhi, Kolayat, Bikaner, Rajasthan. The site covers 12.3 acres.
Who is building it?
The applicant is Ashok Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Mar 2025), as of 27 Nov 2026.
Where is it?
In Samorakhi, Kolayat, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 12.3 acres.
When was it filed?
The application was filed on 23 Jan 2025.
Project details
| Official title | This is a fresh proposal of "Bajri, Silica Sand, Gravel, Kankar, Murrum, Ball Clay" (Minor Mineral) Mining Project (ML.No.27/2023) Over an area of 4.9830 ha. with proposed production capacity of 404100 TPA(ROM) {Marketable Ball clay-182250, Bajri- 70200, Silica Sand- 70200, Gravel/Murram/Kankar- 46800, Total Rejects- 20250 and waste- 14400located at Near Village Samorkhi, Tehsil-Kolayat, District-Bikaner (Rajasthan) by Shree Ashok Kumar S/o Shree Mangi Lal |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 Mar 2025 |
| Application filed | 23 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ashok Kumar |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹2 crore |
| Village / locality | Samorakhi |
| Taluk / tehsil | Kolayat |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-11349 |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.3 acres, this one is larger than 75% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 32 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 28 mining leases have applied within 5 km.
Where it is
Samorakhi, Kolayat, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- This is a fresh proposal of "Bajri, Gravel, Kankar, Murrum, Ball Clay" (Minor… — withdrawn, 0 m away
- Proposed Project of Ball Clay, Silica Sand Mining Project (Lease Area- 3.9883… — environmental approval granted, 250 m away
- Transfer of environmental clearance of Bajri, Ball Clay, Silica Sand, Gravel… — lapsed, 300 m away
- Transfer of environmental clearance of Bajri, Ball Clay, Silica Sand, Gravel… — lapsed, 600 m away
- Ball Clay, Silica Sand, Gravel, Kankar & Murrum (Minor Mineral) Mining… — cleared for impact study, 650 m away
- Proposed Ball Clay, Silica Sand, Bajri, Kankar, Gravel & Murrum Mining lease… — lapsed, 700 m away
- Proposed Ball Clay, Silica Sand, Bajri, Kankar, Gravel & Murrum Mining lease… — cleared for impact study, 700 m away
- Proposed Project of Bajri, Ball Clay, Silica Sand, Gravel, Kankar and Murrum… — lapsed, 700 m away
More from Ashok Kumar in Bikaner
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.