Quick answers
What is this project?
Proposed Project of Granite Mining Project (Lease Area 2.00 ha. Govt. land), Plot No.-65) with production capacity of 2,25,000 TPA (ROM) located Near Village – Parakhiya, Tehsil- Sumerpur, District- Pali (Rajasthan) by Sh. Mahipal Singh S/o Sh. Rajendra Singh Shekhwat is a lapsed mining project in Parakhiya, Sumerpur, Pali, Rajasthan. The site covers 4.9 acres.
Who is building it?
The applicant is Mahipal Singh.
Has it been approved?
No. The application was lapsed on 17 Jul 2026, so it is no longer under consideration.
Where is it?
In Parakhiya, Sumerpur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 30 Sept 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Jul 2026 |
| Application filed | 30 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mahipal Singh |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹2 crore |
| Village / locality | Parakhiya |
| Taluk / tehsil | Sumerpur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-11668 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 54% of them.
8 other mining leases have applied within 500 m of this site; together with this one they cover 36.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 34 mining leases have applied within 5 km.
Where it is
Parakhiya, Sumerpur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Production Capacity of Earlier Granted EC from 13,320 TPA to… — environmental approval granted, 100 m away
- Reappraisal of Earlier Granted EC By DEIAA, Pali, (Raj.). Vide Letter No.- F(… — environmental approval granted, 100 m away
- Proposed Granite Mining Project Delineated Plot No.- 64, Area:1.50Hectare… — cleared for impact study, 200 m away
- Proposed Granite Mining Project, Delineated Plot No.-66, M.L. Area- 2.00 Ha… — cleared for impact study, 200 m away
- This is a Fresh proposal for "Granite (minor mineral) mining project" [Plot… — cleared for impact study, 250 m away
- Sh. Prateek Maderna "Granite (Minor Mineral) mining project" Ref… — environmental approval granted, 300 m away
- Sh. Prateek Maderna "Granite (Minor Mineral) mining project" Ref… — cleared for impact study, 300 m away
- "Granite Mining Project", Ref. No. 20221000052642, — environmental approval granted, 400 m away
More from Mahipal Singh in Pali
- Proposed Project of Granite Mining Project (Lease Area 2.9823ha. Govt. land)… — lapsed
- Granite Mining Project (Lease Area 2.10ha. Govt. land) and, Plot No.-54) with… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.