What is Developing? Open the mapMap

Environmental approval grantedMining · Tonk, Rajasthan

Re-Appraisal of EC Granted from DEIAA Tonk to SEIAA, Rajasthan , for Existing "Quartz & Mica (minor mineral) mining project" [M.L.No.-16/2001] over an Area of 4.90 Hectare with Existing Production Capacity–26754 TPA by Smt. Usha Sharma W/o Shri Koshal Kishor Sharma

Re-Appraisal of EC Granted from DEIAA Tonk to SEIAA, Rajasthan , for Existing "Quartz & Mica (minor mineral) mining project" [M.L.No.-16/2001] over an Area of 4.90 Hectare with Existing Production Capacity–26754 TPA by Smt. Usha Sharma W/o Shri Koshal Kishor Sharma is an approved mining project in Shisola, Peeplu, Tonk, Rajasthan. The site covers 12.1 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Dec 2024).

See it on the live map All projects in Tonk

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Re-Appraisal of EC Granted from DEIAA Tonk to SEIAA, Rajasthan , for Existing "Quartz & Mica (minor mineral) mining project" [M.L.No.-16/2001] over an Area of 4.90 Hectare with Existing Production Capacity–26754 TPA by Smt. Usha Sharma W/o Shri Koshal Kishor Sharma is an approved mining project in Shisola, Peeplu, Tonk, Rajasthan. The site covers 12.1 acres.

Who is building it?

The applicant is Usha Sharma.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 25 Dec 2024), as of 27 Nov 2026.

Where is it?

In Shisola, Peeplu, Tonk, Rajasthan.

How big is it?

It has a stated cost of ₹30 lakh and a site of 12.1 acres.

When was it filed?

The application was filed on 18 Jun 2024.

Project details

Official titleRe-Appraisal of EC Granted from DEIAA Tonk to SEIAA, Rajasthan , for Existing "Quartz & Mica (minor mineral) mining project" [M.L.No.-16/2001] over an Area of 4.90 Hectare with Existing Production Capacity–26754 TPA located at Near Village–Sisola, Tehsil-Piplu, District-Tonk (Raj.) by Smt. Usha Sharma W/o Shri Koshal Kishor Sharma.
StatusEnvironmental approval granted
Status since25 Dec 2024
Application filed18 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantUsha Sharma
Land area12.1 acres (4.9 ha)
Project cost₹30 lakh
Village / localityShisola
Taluk / tehsilPeeplu
DistrictTonk
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-11736

In context

362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.1 acres, this one is larger than 80% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Shisola, Peeplu, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Usha Sharma in Tonk

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.