What is Developing? Open the mapMap

Cleared for impact studyMining · Ajmer, Rajasthan

River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-BJ-13/2024, Mining Lease Plot Area- 60.6134 Ha., Located at Near Reveune Villages- Gulabpura-II & Baral-II, Tehsil- Hurda & Vijaynagar, District-Bhilwara & Beawar, Rajasthan. Proposed Production Capacity-650000 TPA (ROM) proposed by M/s Ganpati Enterprises

River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-BJ-13/2024, Mining Lease Plot Area- 60.6134 Ha., Located at Near Reveune Villages- Gulabpura-II & Baral-II, Tehsil- Hurda & Vijaynagar, District-Bhilwara & Beawar, Rajasthan. Proposed Production Capacity-650000 TPA (ROM) proposed by M/s Ganpati Enterprises is a proposed mining project in Baral, Vijaynagar, Ajmer, Rajasthan. The site covers 149.8 acres. Its stated project cost is ₹16 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Sept 2024).

See it on the live map All projects in Ajmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-BJ-13/2024, Mining Lease Plot Area- 60.6134 Ha., Located at Near Reveune Villages- Gulabpura-II & Baral-II, Tehsil- Hurda & Vijaynagar, District-Bhilwara & Beawar, Rajasthan. Proposed Production Capacity-650000 TPA (ROM) proposed by M/s Ganpati Enterprises is a proposed mining project in Baral, Vijaynagar, Ajmer, Rajasthan. The site covers 149.8 acres.

Who is building it?

The applicant is Satpal.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Sept 2024), as of 27 Nov 2026.

Where is it?

In Baral, Vijaynagar, Ajmer, Rajasthan.

How big is it?

It has a stated cost of ₹16 crore and a site of 149.8 acres.

When was it filed?

The application was filed on 2 Aug 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-BJ-13/2024, Mining Lease…

Project details

StatusCleared for impact study
Status since5 Sept 2024
Application filed2 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSatpal
Land area149.8 acres (60.6 ha)
Project cost₹16 crore
Village / localityBaral
Taluk / tehsilVijaynagar
DistrictAjmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-11951

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Apr 2025Environmental approval granted149.8 acres₹16 crore
Early planning filed 2 Aug 2024 (this page)Cleared for impact study149.8 acres₹16 crore

In context

1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 149.8 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Baral, Vijaynagar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.