Quick answers
What is this project?
River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-BJ-13/2024, Mining Lease Plot Area- 60.6134 Ha., Located at Near Reveune Villages- Gulabpura-II & Baral-II, Tehsil- Hurda & Vijaynagar, District-Bhilwara & Beawar, Rajasthan. Proposed Production Capacity-650000 TPA (ROM) proposed by M/s Ganpati Enterprises is a proposed mining project in Baral, Vijaynagar, Ajmer, Rajasthan. The site covers 149.8 acres.
Who is building it?
The applicant is Satpal.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 5 Sept 2024), as of 27 Nov 2026.
Where is it?
In Baral, Vijaynagar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹16 crore and a site of 149.8 acres.
When was it filed?
The application was filed on 2 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-BJ-13/2024, Mining Lease…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 Sept 2024 |
| Application filed | 2 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Satpal |
| Land area | 149.8 acres (60.6 ha) |
| Project cost | ₹16 crore |
| Village / locality | Baral |
| Taluk / tehsil | Vijaynagar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-11951 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Apr 2025 | Environmental approval granted | 149.8 acres | ₹16 crore |
| Early planning filed 2 Aug 2024 (this page) | Cleared for impact study | 149.8 acres | ₹16 crore |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 149.8 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Baral, Vijaynagar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-BJ-13/2024, Mining… — environmental approval granted, 0 m away
- Patiyon Ka Khera, Lamba & Baral River Sand (Bajri) Mining Lease Area in… — environmental approval granted, 2.3 km away
- Patiyon Ka Khera, Lamba & Baral River Sand (Bajri) Mining Lease Area in… — cleared for impact study, 2.3 km away
- M/S SYMPHONIA AND GRAPHICUS PVT. LTD., Plot No.– BJ-14, Bajri (River Sand)… — lapsed, 2.9 km away
- Proposed River Sand (Bajri) Mining Project, Plot No. BJ-14, Area – 43.2743 Ha.… — cleared for impact study, 2.9 km away
- Reappraisal of the EC granted by DEIAA Ajmer for Masonry Stone Mining Project,… — environmental approval granted, 5.7 km away
- Reappraisal of the EC granted by DEIAA Ajmer for Quartz & Feldspar Mining… — lapsed, 5.9 km away
- Quartz and Feldspar Mining Project, M.L. No: 386/2007 — lapsed, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.