What is Developing? Open the mapMap

Environmental approval grantedMining · Ajmer, Rajasthan

M/S Asian Gold Mine [re-Appraisal of Ec Granted From Deiaa Ajmer to Seiaa Rajasthan Existing "quartz 7 Feldspar (Minor Mineral) Mining Project" [m.L.No.-325/2004] Over an Area of 4.20 Hectare With Proposed Production Capacity– 110450 Tpa (Rom)

M/S Asian Gold Mine [re-Appraisal of Ec Granted From Deiaa Ajmer to Seiaa Rajasthan Existing "quartz 7 Feldspar (Minor Mineral) Mining Project" [m.L.No.-325/2004] Over an Area of 4.20 Hectare With Proposed Production Capacity– 110450 Tpa (Rom) is an approved mining project in Shyamgarh, Masuda, Ajmer, Rajasthan. The site covers 10.4 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 24 Jan 2025).

See it on the live map All projects in Ajmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

M/S Asian Gold Mine [re-Appraisal of Ec Granted From Deiaa Ajmer to Seiaa Rajasthan Existing "quartz 7 Feldspar (Minor Mineral) Mining Project" [m.L.No.-325/2004] Over an Area of 4.20 Hectare With Proposed Production Capacity– 110450 Tpa (Rom) is an approved mining project in Shyamgarh, Masuda, Ajmer, Rajasthan. The site covers 10.4 acres.

Who is building it?

The applicant is Asian Gold Mine.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 24 Jan 2025), as of 27 Nov 2026.

Where is it?

In Shyamgarh, Masuda, Ajmer, Rajasthan.

How big is it?

It has a stated cost of ₹60 lakh and a site of 10.4 acres.

When was it filed?

The application was filed on 31 Aug 2024.

Project details

Official titleM/S Asian Gold Mine [re-Appraisal of Ec Granted From Deiaa Ajmer to Seiaa Rajasthan Existing "quartz 7 Feldspar (Minor Mineral) Mining Project" [m.L.No.-325/2004] Over an Area of 4.20 Hectare With Proposed Production Capacity– 110450 Tpa (Rom), Located at Near Village– Shyamgarh, Tehsil – Masuda, District- Ajmer(Rajasthan)]
StatusEnvironmental approval granted
Status since24 Jan 2025
Application filed31 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAsian Gold Mine
Land area10.4 acres (4.2 ha)
Project cost₹60 lakh
Village / localityShyamgarh
Taluk / tehsilMasuda
DistrictAjmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-12415

In context

1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10.4 acres, this one is larger than 72% of them.

No other mining lease on record is within 500 m of this site; 19 have applied within 5 km.

Where it is

Shyamgarh, Masuda, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Asian Gold Mine in Ajmer

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.