What is Developing? Open the mapMap

Environmental approval grantedMining · Bikaner, Rajasthan

Expansion in Production capacity of Earlier Granted EC Proposed from 120000 TPA to 377100 TPA (ROM) {Saleable– 300300 TPA and Waste– 76800 TPA} for Existing "Lime Stone (Minor Mineral) mining project" [M.L. No. – 18/2014] over an Area of 4.0 Hectare, located Near Village-Sarunda, Tehsil-Nokha & District-Bikaner (Rajasthan) proposed by Shri Ramdev S/o Shri Banshilal Bishnoi.

Expansion in Production capacity of Earlier Granted EC Proposed from 120000 TPA to 377100 TPA (ROM) {Saleable– 300300 TPA and Waste– 76800 TPA} for Existing "Lime Stone (Minor Mineral) mining project" [M.L. No. – 18/2014] over an Area of 4.0 Hectare, located Near Village-Sarunda, Tehsil-Nokha & District-Bikaner (Rajasthan) proposed by Shri Ramdev S/o Shri Banshilal Bishnoi is an approved mining project in Sarunda, Nokha, Bikaner, Rajasthan. The site covers 9.9 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Sept 2024).

See it on the live map All projects in Bikaner

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in Production capacity of Earlier Granted EC Proposed from 120000 TPA to 377100 TPA (ROM) {Saleable– 300300 TPA and Waste– 76800 TPA} for Existing "Lime Stone (Minor Mineral) mining project" [M.L. No. – 18/2014] over an Area of 4.0 Hectare, located Near Village-Sarunda, Tehsil-Nokha & District-Bikaner (Rajasthan) proposed by Shri Ramdev S/o Shri Banshilal Bishnoi is an approved mining project in Sarunda, Nokha, Bikaner, Rajasthan. The site covers 9.9 acres.

Who is building it?

The applicant is Ramdev.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Sept 2024), as of 27 Nov 2026.

Where is it?

In Sarunda, Nokha, Bikaner, Rajasthan.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 9.9 acres.

When was it filed?

The application was filed on 20 Mar 2024.

Project details

StatusEnvironmental approval granted
Status since20 Sept 2024
Application filed20 Mar 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRamdev
Land area9.9 acres (4 ha)
Project cost₹1.2 crore
Village / localitySarunda
Taluk / tehsilNokha
DistrictBikaner
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-12746

In context

516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 9.9 acres, this one is smaller than 56% of them.

No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.

Where it is

Sarunda, Nokha, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ramdev in Bikaner

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.