Quick answers
What is this project?
Reappraisal of the EC granted by DEIAA Ajmer for Marble Mining Project, M.L. No: 62/1999 is an approved mining project in Kayampura, Ajmer, Rajasthan. The site covers 1.6 acres.
Who is building it?
The applicant is Narendra Kumar Malakar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 May 2025), as of 27 Nov 2026.
Where is it?
In Kayampura, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹25 lakh and a site of 1.6 acres.
When was it filed?
The application was filed on 30 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 May 2025 |
| Application filed | 30 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Narendra Kumar Malakar |
| Land area | 1.6 acres (0.6 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Kayampura |
| Taluk / tehsil | Ajmer |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-13296 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is smaller than 97% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 9.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Kayampura, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- This is an existing mining lease "Marble (Minor Mineral) mining project" for… — environmental approval granted, 300 m away
- Reappraisal of the EC granted by DEIAA Ajmer for Marble Mining Project, M.L.… — environmental approval granted, 350 m away
- Marble Mining Project, M.L. No. 63/1999 — lapsed, 350 m away
- Abhishek Bansal (M.L.No. 18/2000) — lapsed, 350 m away
- Transfer of Environmental Clearance for "Marble Mining Project (ML No.-… — lapsed, 1.3 km away
- Re-appraisal of Existing Marble Mining Project, ML. No.- 41/1998, Area: 0.7957… — environmental approval granted, 1.3 km away
- Shri Om Prakash Seksaria[re Appraisal of Ec Granted From Deiaa Ajmer to Seiaa… — environmental approval granted, 3.3 km away
- Re-Appraisal of Ec Granted From Deiaa Ajmer to Seiaa Rajasthan Existing… — environmental approval granted, 3.7 km away
More from Narendra Kumar Malakar in Ajmer
- Reappraisal of the EC granted by DEIAA Ajmer for Marble Mining Project, M.L.… — environmental approval granted
- Marble Mining Project, M.L. No. 63/1999 — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.