Project details
| Status | Withdrawn |
|---|---|
| Status since | 6 Jul 2026 |
| Application filed | 18 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Blackstone Mining Company |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Bokhla |
| Taluk / tehsil | Bichiwara |
| District | Dungarpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-13423 |
In context
167 applications in Dungarpur since January 2022 are in the same category (Mining): 89 approved, 6 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 11.9 acres, this one is larger than 82% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bokhla, Bichiwara, Dungarpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in production capacity of Soapstone and mineral inclusion of Masonry… — withdrawn, 0 m away
- Expansion in production capacity of Soapstone and mineral inclusion of Masonry… — withdrawn, 0 m away
- Expansion in production capacity of Soapstone and mineral inclusion of Masonry… — lapsed, 0 m away
- EC Re-appraisal of Existing Soapstone Mining Lease (M.L. No. – 06/1978 Area:… — environmental approval granted, 0 m away
- Existing Soapstone Mining Lease (M.L. No. – 06/1978 Area: 4.80 Ha) Near… — environmental approval granted, 0 m away
- Shishod Masonary Stone Mine (M.L.20/1997, Area1.00 Hect.) of Shri Nagendra… — environmental approval granted, 3.7 km away
- Smt. Shanti Devi Panchal, Masonary Stone, ML NO-428/1991 — environmental approval granted, 4.3 km away
- Proposed Soapstone (Minor Mineral) Mining Project, Plot No.- 38/2024, Lease… — cleared for impact study, 5 km away
More from Blackstone Mining Company in Dungarpur
- Expansion in production capacity of Soapstone and mineral inclusion of Masonry… — withdrawn
- Expansion in production capacity of Soapstone and mineral inclusion of Masonry… — withdrawn
- Expansion in production capacity of Soapstone and mineral inclusion of Masonry… — lapsed
- EC Re-appraisal of Existing Soapstone Mining Lease (M.L. No. – 06/1978 Area:… — environmental approval granted
- Existing Soapstone Mining Lease (M.L. No. – 06/1978 Area: 4.80 Ha) Near… — environmental approval granted
All 6 Blackstone Mining Company projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.