What is Developing? Open the mapMap

LapsedMining · Bharatpur, Rajasthan

Transfer of Environment Clearance [From M/S Baljai Grits to M/s INTERFLOW ENERGY PRIVATE LIMTED ,Arshad (Authorized Signatory),of Masonry Stone, Mining Project, ML. NO. -640/09, with Production Capacity 50885 TPA over an Area – 1.00 Hectare, Near Village- Chappra, Tehsil-Pahari, District -Bharatpur Rajasthan), ] by Applicant M/s INTERFLOW ENERGY PRIVATE LIMTED ]Arshad (Authorized Signatory) .

Transfer of Environment Clearance [From M/S Baljai Grits to M/s INTERFLOW ENERGY PRIVATE LIMTED ,Arshad (Authorized Signatory),of Masonry Stone, Mining Project, ML. NO. -640/09, with Production Capacity 50885 TPA over an Area – 1.00 Hectare, Near Village- Chappra, Tehsil-Pahari, District -Bharatpur Rajasthan), ] by Applicant M/s INTERFLOW ENERGY PRIVATE LIMTED ]Arshad (Authorized Signatory) is a lapsed mining project in Chhapra, Pahari, Bharatpur, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹35 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 2 Aug 2025).

See it on the live map All projects in Bharatpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Transfer of Environment Clearance [From M/S Baljai Grits to M/s INTERFLOW ENERGY PRIVATE LIMTED ,Arshad (Authorized Signatory),of Masonry Stone, Mining Project, ML. NO. -640/09, with Production Capacity 50885 TPA over an Area – 1.00 Hectare, Near Village- Chappra, Tehsil-Pahari, District -Bharatpur Rajasthan), ] by Applicant M/s INTERFLOW ENERGY PRIVATE LIMTED ]Arshad (Authorized Signatory) is a lapsed mining project in Chhapra, Pahari, Bharatpur, Rajasthan. The site covers 2.5 acres.

Who is building it?

The applicant is Interflow Energy Private Limited.

Has it been approved?

No. The application was lapsed on 2 Aug 2025, so it is no longer under consideration.

Where is it?

In Chhapra, Pahari, Bharatpur, Rajasthan.

How big is it?

It has a stated cost of ₹35 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 3 Dec 2024.

Project details

StatusLapsed
Status since2 Aug 2025
Application filed3 Dec 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantInterflow Energy Private Limited
Land area2.5 acres (1 ha)
Project cost₹35 lakh
Village / localityChhapra
Taluk / tehsilPahari
DistrictBharatpur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-14509

In context

945 applications in Bharatpur since January 2022 are in the same category (Mining): 401 approved, 81 filed or under review, and 463 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 94% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 49.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 266 mining leases have applied within 5 km.

Where it is

Chhapra, Pahari, Bharatpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Interflow Energy Private Limited in Bharatpur

All 3 Interflow Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.